13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>In 2002-2003, <strong>Gold</strong>er Associates from Santiago (<strong>Gold</strong>er) identified all holes requiringdetailed geotechnical logging that was completed by <strong>Gold</strong>er trained staff. CMM geologiststypically recorded both Rock Quality Designation (RQD) and recovery data <strong>for</strong> each hole.Recoveries averaged better than 95% during <strong>the</strong> 2003 program. In 2006, average corerecovery was 96%.12.4 Geotechnical Core Logging<strong>Gold</strong>er managed <strong>the</strong> geotechnical program. Francisco Carrasco, (Project Manager) andJoaquin Cabello (Assistant Manager) supervised <strong>the</strong> filed programs and provided <strong>the</strong> initialtraining. The program included detailed geotechnical logging of selected drill holes, uniaxialcompressive strength (UCS) testing of selected cores, completion of a seven (7) holeoriented core program and cell mapping of existing pit walls and road cuts. <strong>Gold</strong>er alsomanaged a hydrology study including installation of piezometer wells <strong>for</strong> monitoring waterlevels.<strong>Gold</strong>er provided all initial training and completed frequent site visits to maintain qualitycontrol of <strong>the</strong> work and upgrade training of <strong>the</strong> field staff per<strong>for</strong>ming <strong>the</strong> work.CMM adopted identical geotechnical logging procedures in 2006 under <strong>the</strong> supervision of<strong>the</strong> same geotechnical engineer employed by CMM in 2003.12.5 Composite Sample SummaryThe full composite summary <strong>for</strong> both Verde and Pancho are shown in Tables 17-4 and 17-5respectively.47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!