13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>The QA/QC Database Manager has certified that <strong>the</strong> database as transferred to <strong>Kinross</strong><strong>Technical</strong> Services on CD-R media is free of gross errors and omissions and is suitable <strong>for</strong>estimating resource and reserve estimates.14.4 Data Entry, Storage, Management and SecurityThe QA/QC Database Manager was responsible <strong>for</strong> updating and managing <strong>the</strong> ProjectDatabase (PDB). Only <strong>the</strong> QA/QC Database Manger could access, update or o<strong>the</strong>rwisemodify <strong>the</strong> PDB. Regular backups were made to CD-R disks over <strong>the</strong> duration of <strong>the</strong>program. The final PDB was transferred to <strong>Kinross</strong> <strong>Technical</strong> Services to be used inresource modeling.14.4.1 Data EntryCollar CoordinatesThe mine survey department entered collar coordinates, drill azimuth and inclination intospreadsheets that were provided to <strong>the</strong> QA/QC Database Manager. The QA/QC DatabaseManager checked <strong>the</strong> spreadsheet data against original survey field notes prior to importing<strong>the</strong> data into <strong>the</strong> PDB. Cross sections and drill hole composite plans were plotted usingGemcom software and were inspected by <strong>the</strong> Senior Geologist <strong>for</strong> collar and directionalerrors. Final hole depths were verified against <strong>the</strong> drill log hole depth.Downhole Survey DataComprobe provided <strong>the</strong> downhole survey data in spreadsheet <strong>for</strong>mat to CMM’s OfficeManager who checked <strong>the</strong> data <strong>for</strong> obvious errors. Once satisfied that <strong>the</strong> downhole surveydata was correct, <strong>the</strong> Office Manager provided <strong>the</strong> spreadsheet files to <strong>the</strong> QA/QC DatabaseManager <strong>for</strong> import into <strong>the</strong> PDB.Lithology, Alteration, <strong>Mine</strong>ralization and OxidationThe Office Manager and Data Entry Clerks entered data from <strong>the</strong> field lithology logs intospreadsheets, one <strong>for</strong> each hole. A double-blind entry system was not used in recording thisdata. A 100% manual check of this data was per<strong>for</strong>med at <strong>the</strong> end of <strong>the</strong> drill program.56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!