13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>The SART name is derived from an acronym describing <strong>the</strong> unit operations in <strong>the</strong> process,as follows:• Sulphidization• Acidification• Recycling of precipitate/s• Thickening of precipitate/sThe SART process flowsheet is shown schematically below in Figure 16-3.Figure 16-3: SART Plant FlowsheetSART Plant FlowsheetPreg Solution(Au, Cu)from HeapsLimeLimeScrubberNaSHLimeVent from Reactors,Settlers to Lime Scrubber<strong>for</strong>HCN, H 2SFlocculentFlocculentCu 2 SPrecipitationReactorNeutralizationReactorCu 2S Precipitate SettlerGypsum Precipitate SettlerSulphuricAcidCu 2S Precipitate RecycleGypsum RecycleCu 2S FilterGypsum FilterCu 2S DrierDry Cu 2SGypsumPrecipitate<strong>for</strong> BaggingBagged Cu 2 SPrecipitateTo SmelterPrecipitate<strong>for</strong> DisposalCa(CN) 2 Recycleto HeapsSART, as originally developed, involves adding chemical sulphide ions, such as sodiumhydro-sulphide (NaSH), to an acidified CN solution (pH 10 to pH 5 or below) to precipitatecopper, silver and zinc (if present) as metal sulphides and convert cyanide to HCN, underweakly acidic conditions. O<strong>the</strong>r CN solubilized metals like Ni and Co would also beprecipitated. HCN is a very soluble gas, and remains in solution until <strong>the</strong> Cu 2 S, Ag 2 S or ZnS74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!