13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>Standards on <strong>Mine</strong>ral Resources and Reserves, Definition and Guidelines Resourcesclassification was based on <strong>the</strong> variogram ranges <strong>for</strong> each zone, number of holes found in<strong>the</strong> search ellipsoid and proximity of <strong>the</strong> composites to <strong>the</strong> center of <strong>the</strong> block beingestimated.17.5.1 Resource Classification VerdeThe model update resulted in a better understanding of <strong>the</strong> mineralization and its controls atVerde. The following conditions had to be met <strong>for</strong> classifying <strong>the</strong> blocks in <strong>the</strong> model.• Measured Resource – In<strong>for</strong>mation from three drill holes found in a 50 m searchellipsoid with <strong>the</strong> closest composite at a distance of 35 m or less.• Indicated Resource – Data from two drill holes found within a search of 70 m with <strong>the</strong>closest composite at a maximum distance of 50 m.• Inferred Resource – Remainder of <strong>the</strong> blocks including all <strong>the</strong> blocks located inDomain 3.17.5.2 Resource Classification PanchoThe model is now including an epi<strong>the</strong>rmal upper portion that is drilled on approximately 35 mand a porphyry system drilled at depth with average drill spacing greater than 75 m in someareas. These considerations and <strong>the</strong> experience gained while mining at Verde also guided<strong>the</strong> new classification scheme used <strong>for</strong> Pancho. The following conditions had to be met <strong>for</strong>classifying <strong>the</strong> blocks in <strong>the</strong> model.• Measured Resource – In<strong>for</strong>mation from three drill holes found in a 75 m searchellipsoid with <strong>the</strong> closest composite at a distance of 35 m or less.• Indicated Resource – Data from two drill holes found within a search of 100 m with<strong>the</strong> closest composite at a maximum distance of 50 m.• Inferred Resource – Remainder of <strong>the</strong> blocks.17.6 <strong>Mine</strong>ral Resource EstimateThe mineral resources estimated using a $625 gold price <strong>for</strong> Verde and Pancho as ofDecember 31, 2007 are presented in Table 17-5. <strong>Mine</strong>ral resources are reported exclusivelyof reserves.89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!