13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>Figure 16-2: Metallurgical Sample Locations – Pancho Pit – 4300 Level16.1.4 Bond Work IndexBond Work Index (BWI) samples were collected from <strong>the</strong> 10, HQ diameter core holes drilledat Verde. Bond work index tests required selection of whole HQ core pieces of approximatelength of 0.15 – 0.20 meters. For Verde, such pieces were selected every 4 meters downhole.All ten Verde HQ diameter holes were sampled in this manner, a total of 296 samples.At Pancho, BWI samples were collected from <strong>the</strong> standard diameter drill holes. Whole corepieces were taken approximately every 20 meters down hole. A total of 67 samples wereselected. All samples were shipped to Hazen Research, Colorado, <strong>for</strong> analysis.Results of <strong>the</strong> BWI tests indicated limited variability in <strong>the</strong> rock mass <strong>the</strong>re<strong>for</strong>e; <strong>the</strong> BWI datawas not modeled when completing <strong>the</strong> Verde and Pancho resource models.64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!