13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>23.8 Economic AnalysesThe discounted cash flow analysis indicates that <strong>the</strong> mine generates a positive cash flow.The details of <strong>the</strong> economic and sensitivity analyses are considered by <strong>Kinross</strong> to beconfidential in<strong>for</strong>mation. The economic models are considered as complete, reasonable, andmeeting generally accepted industry standards. This in<strong>for</strong>mation is available and individualsseeking to review <strong>the</strong>se models must request and sign a confidentiality agreement with<strong>Kinross</strong> <strong>Gold</strong> Corporation.23.9 PaybackThis is not applicable to <strong>the</strong> producing operation.23.10 <strong>Mine</strong> LifeA complete Life-of-<strong>Mine</strong> plan was prepared based on <strong>the</strong> estimated mineral reserves. Themineral reserves are sufficient to support gold production until 2024 (see Table 23-3).Table 23-3: 2007 Life of <strong>Mine</strong> PlanYear 2008 2009 2010 2011 2012 2013 2014 2015Ore(tonnes) 15,400,000 16,051,200 17,234,805 17,259,980 17,285,155 17,285,155 17,285,155 17,285,155Stripratio 0.68 0.97 0.97 0.97 0.93 0.93 0.93 0.93Waste(tonnes) 10,471,820 15,610,696 16,717,761 16,742,181 16,075,194 16,075,194 16,075,194 16,075,194Grade(g/t) 0.77 0.82 0.80 0.78 0.80 0.78 0.69 0.64Recovery(%) 58.2% 56.2% 58.2% 63.9% 83.1% 77.8% 75.7% 74.0%Recov.ounces 222,753 239,048 257,383 278,076 371,321 335,893 290,088 264,647Totaltonnes 25,871,820 31,661,896 33,952,566 34,002,161 33,360,349 33,360,349 33,360,349 33,360,349Year 2016 2017 2018 2019 2020 2021 2022 2023 2024Ore(tonnes) 17,285,155 17,285,155 17,285,155 17,285,155 17,285,155 17,285,155 17,285,155 17,285,155 6,603,551Stripratio 0.93 0.93 0.93 0.93 0.93 0.38 0.16 0.23 0.21Waste(tonnes) 16,075,194 16,075,194 16,075,194 16,075,194 16,075,194 6,646,585 2,767,186 4,023,861 1,372,398Grade(g/t) 0.58 0.78 0.73 0.65 0.63 0.73 0.63 0.66 0.62Recovery(%) 71.4% 65.6% 57.9% 58.7% 75.3% 69.8% 72.4% 68.2% 68.0%Recov.ounces 231,371 285,514 234,528 213,115 262,729 283,548 253,468 251,302 89,768Totaltonnes 33,360,349 33,360,349 33,360,349 33,360,349 33,360,349 23,931,740 20,052,341 21,309,016 7,975,949110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!