13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>interpretation and <strong>the</strong> spatial controls of mineralization was undertaken <strong>for</strong> both Verde andPancho resulting in new resource models to support updated <strong>Mine</strong>ral Resource and <strong>Mine</strong>ralReserve estimates.In addition to <strong>the</strong> analytical data, <strong>the</strong> 2002-2003 drill program was also used to collectcarefully controlled metallurgical samples from Verde and Pancho. A total of 58 directagitation (bottle roll) and 18 column leach test samples were collected and analyzed. Themetallurgical samples were carefully selected to ensure adequate sample coverage ofvarious grade bins, recovery classes and lithologies. More metallurgical test work wascompleted in 2006 and 2007 with <strong>the</strong> addition of 19 column tests <strong>for</strong> Pancho. The datacompiled to date indicates that gold recovery from <strong>the</strong> Pancho samples tested isapproximately 68% <strong>for</strong> <strong>the</strong> sulphide ore and 85% <strong>for</strong> <strong>the</strong> oxide ore. This recent test workplus <strong>the</strong> work completed in 2003 confirms that <strong>the</strong> gold recovery values used in <strong>the</strong> 2007reserve estimate are reasonable.In 2007, <strong>the</strong> SART process was tested <strong>for</strong> <strong>the</strong> Pancho ore given <strong>the</strong> higher concentrations ofcopper present in <strong>the</strong> ore. Some of <strong>the</strong> copper minerals are soluble in cyanide solutions and<strong>the</strong>se minerals consume cyanide reagent and contaminate <strong>the</strong> leach solution with coppermetal. A feasibility study and pilot testing program were completed by Idesol and SGSLakefield of Santiago. The study considers plant design, per<strong>for</strong>mance metrics, operating andcapital costs and implementation strategy. The reserves defined at Pancho consider <strong>the</strong>application of SART.Ore and waste hardness was also tested in 2002-2003. Specific gravity of <strong>the</strong> various rocktypes was confirmed through extensive field sampling. In 2006, specific gravitymeasurements were also per<strong>for</strong>med on more than 1,500 core samples from Pancho.The resource block models were first updated in 2003 to reflect <strong>the</strong> lithological modelsdeveloped from observations taken from drill core. At <strong>the</strong> same time, a new recovery modelwas developed based on <strong>the</strong> visual logging of oxidation. The visual estimates werecompleted using a well-established scale previously used on <strong>the</strong> project. In 2006, with <strong>the</strong>additional core samples, <strong>the</strong> surfaces defining oxidation levels were updated (oxide, mixedand sulphide).13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!