13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>4.0 PROPERTY DESCRIPTION AND LOCATIONThe <strong>Maricunga</strong> Property is located in <strong>the</strong> <strong>Maricunga</strong> District of Region III in Chile. Theproperty is located 120 km due east of <strong>the</strong> city of Copiapó at elevations between 4,200 mand 4,500 m above mean sea level. The <strong>Maricunga</strong> <strong>Mine</strong> (<strong>for</strong>merly known as Refugio) islocated at 27 degrees 33 minutes south latitude and 69 degrees 18 minutes west longitude.Figure 4-1 is a generalized location map of <strong>the</strong> project.Figure 4-1: <strong>Maricunga</strong> Location Map4.1 Claim StatusAll surface and mineral claims, surface rights and water rights are maintained in goodstanding. Mining claims total 8,380 hectares while <strong>the</strong> exploration properties held by CMMinclude 5,900 hectares. Chilean attorneys monitor claim status on behalf of CMM annually.No ownership issues with respect to <strong>the</strong> mineral claims hosting <strong>the</strong> project’s mineralresource and reserve estimates have been identified. The project mineral rights and claims20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!