13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>2.0 INTRODUCTION AND TERMS OF REFERENCE2.1 IntroductionThis <strong>Technical</strong> <strong>Report</strong> <strong>for</strong> <strong>the</strong> <strong>Maricunga</strong> <strong>Mine</strong> has been prepared to support <strong>the</strong> 2007<strong>Kinross</strong> <strong>Gold</strong> Corporation (<strong>Kinross</strong>) Annual <strong>Mine</strong>ral Resources and Reserves Statement andhas been prepared under <strong>the</strong> direct supervision of <strong>the</strong> qualified person, Maryse Bélanger, P.Geo., Director <strong>Technical</strong> Services, <strong>Kinross</strong> Americas with contributions from CMM technicalstaff and <strong>Kinross</strong> <strong>Technical</strong> Services.2.2 Terms of ReferenceUnless o<strong>the</strong>rwise noted:• all units of measurement in <strong>the</strong> following report are in metric measure;• all costs are expressed in terms of United States dollars;• all metal prices are expressed in terms of United States dollars;• a <strong>for</strong>eign exchange rate of $1.0 US = 530 Chilean pesos was used.2.3 Scope of WorkThe following <strong>Technical</strong> <strong>Report</strong> considered <strong>the</strong> following:• regional and local geology, structure, alteration and mineralization;• sample collection, preparation, security and analysis;• quality assurance and quality control procedures;• data entry, verification, management, security and storage;• block modelling, grade interpolation and resource estimation;• metallurgical recovery, plant design and per<strong>for</strong>mance;• mine planning, scheduling and reserve estimation;17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!