13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>Table 17-14: Optimization Parameters <strong>for</strong> VerdeMining CostsUnit Mining Costs $1.000Mining Recovery 97.50%Mining Dilution 2.50%MCAF based onelev $0.016Pit SlopesProfile 1 (EastVerde) Azimuth Slope10 44.5Below 4350 m 65 49155 52.5275 49Profile 2 (EastVerde) Azimuth SlopeFrom 4360 to 4430m 70 44.5153 49Profile 3 (EastVerde) Azimuth SlopeAbove 4440 0 380 180Profile 4 Azimuth SlopeWest Verde 0 5190 51180 49270 49Process RecoveriesOxide Au 73%Mixed Au 70%Sulphide Au 53%Processing CostsProcess costs $US/t $3.76<strong>Gold</strong> Prices $550 and $625Selling costs $US/ozScaled to gold priceA Mining Cost Adjustment Factor (MCAF) was also included to take into account <strong>the</strong>increased haul distance as <strong>the</strong> pit will get deeper. The base mining cost used was $1.00 pertonne with an added $0.084 <strong>for</strong> longer ore haul to crusher and waste dump. Ano<strong>the</strong>r $0.016was also added per 10 m bench from 4300 m elevation to consider extra haul above orbelow <strong>the</strong> pit access road. Sustaining capital <strong>for</strong> leach pad development was also included($0.26 per tonne).The Pancho ore will be processed at a rate of approx. 49,000 tpd over <strong>the</strong> life of mine.Average heap leach gold recoveries are based on test work results: 85% <strong>for</strong> oxide ore, 75%92

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!