13.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section –1Guide <strong>for</strong> Design of Outdoor Step up Sub-Stationand Selection of Equipment1 IntroductionOutdoor step up substation at <strong>hydro</strong>electric stations are provided to step up power atgenerated voltage generally <strong>for</strong> interconnection with the grid to evacuate power.Generation voltage in SHP varies from 415 volts to 11 kV and step up voltage of <strong>small</strong><strong>hydro</strong> upto 25 MW capacity may not exceed 145 kV. Guidelines <strong>for</strong> design and selectionof comprises of main equipment, ancillary equipment, switchyard structures and substation layout.2. Design RequirementsReferences and CodesLatest edition of the following shall apply.IS: 9920 Part I to IV – Alternating current switches <strong>for</strong> rated voltages above 1000 voltsand less than 52 kVIS: 9921Part 1 to 5 – Alternating currents disconnectors (isolators) and earthing switchesrating, design, construction, tests etc.IS: 1893 – Criteria <strong>for</strong> Earthquake resistance design of structuresIS: 2705 Part 1 to 4 – Current trans<strong>for</strong>merIS: 3156 Part 1 to 4 – voltage trans<strong>for</strong>merIS: 3070 part 1 to 3 – Lightning arrestorsIS: 2544 – Porcelain insulators <strong>for</strong> system above 1000 VIS: 5350 – Part III – post insulator units <strong>for</strong> systems greater than 1000 VIS: 5621 – Hollow Insulators <strong>for</strong> use in electrical equipmentIS: 5556 – Serrated lock washers – specificationIS: 3716 – Application guide <strong>for</strong> insulation co-ordinationIS: 2165 – Phase to earth insulation co-ordinationRural electrification Corporation (REC) specification and <strong>standards</strong>Power Engineers Hand Book - Tamil Nadu Engineer’s AssociationCentral Board of Irrigation and Power - Manual on Sub-Station LayoutUPSEB - Construction Manual <strong>for</strong> Rural Electrification and secondary system planning2.1 GeneralThe equipment shall be designed and manufactured to provide most optimum functionalvalue and neat appearance. All major assemblies or equipment shall be designedto facilitate easy and quick surveillance, maintenance and optimum operation. Allcontrol sequences shall be simple and rational.1-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!