13.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

) The limits of temperature rise mentioned above and over load capacity as per IEC-354(1993) will have to be satisfied by the manufacturer by carrying out the heat run test atthe lowest negative tap. This test shall be carried out by feeding the following losses: -(Total max. losses at 75 deg. C at highest current tap) x 1.1c) The safe overload capacity of the trans<strong>for</strong>mer and the duration of overload <strong>for</strong> each typeof cooling (ONAN/ONAF/ ) under maximum temperature conditions (Clause 6.5 above )without any damage to the winding or harmful effects on the insulation shall be clearlystated in the tender, which must be as per IEC-354 (1993) – Guide <strong>for</strong> loading of oilimmersed trans<strong>for</strong>mers, suitable <strong>for</strong> climatic conditions given in clause-6.4 above.d) The trans<strong>for</strong>mer may be operated without exceeding temperature rises, winding gradientsand hot spot at any particular tapping at the rated MVA provided that the voltage does notvary by more than 10% of the voltage corresponding to that tappings. Trans<strong>for</strong>mer shallbe able to withstand <strong>for</strong> 30 minutes after achieving steady state at full load rating withoutinjurious heating to winding/insulation etc. under auxiliary failure condition.3-16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!