13.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 2.31. Basic Data Example 1.Highest voltage <strong>for</strong> equipment Um k V rms 145Corresponding line to (ground) neutralU m voltage k V rms 83.72 3 Corresponding Temporary over voltage(derived from system studies)This voltage is high in step up sub stationsdue to load rejection i.e. 1.5 per unitk V rms 104.652.Minimum safety factorFor lightning overvoltagesRepresentative Characteristics ofSurge Diverter (obtain frommanufacturer)Rated Voltage (nearest available above125 x 104.65)Maximum lightning impulse spark overvoltageMaximum front-of-wave impulse sparkover voltageMaximum residual impulse spark overvoltage3 Protection Levels1.25kV rms 140kV 415kV 470kV 405To lightning impulse kV 4154 Insulation level (phase to earth)Lightning ImpulseMinimum lightning impulse voltage kV 415Rated lightning impulse voltage as perIS:Ratio of the rated lightning impulsevoltage to the lightning impulseprotective levelkV 550kV 1.321-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!