13.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Loss Capitalization <strong>for</strong>mula (Loading factor)Annexure-3.3Method <strong>for</strong> calculating the loading factors <strong>for</strong> evaluation of loss capitalization to be specified bythe purchaser as per CBI & P is as follows:The values indicated are typical values and the utility may adopt values different from thoseindicated in case the rates of interest, cost of energy and the number of hours of operation aredifferent from those indicated in the example below. A life expectancy of less than 25 years isnot recommended.Loading factor <strong>for</strong> no load loss nnA = H E 1 r1/ r 1r = 1rCnn 1/r1 rRate of Expect Number of Cost of 1 +interest ed life hours of energy to r r nr n h E cin perunitoperation ina yearthe utilityat 11 kVlevel0.08 25 8400 E c 1.08 6.8484751 1 nnr 1 r1 n / r 1r 1 A =loadingfactor perkW of ironloss5.84848 10.97477619 Rs.8966xE cLoading factor <strong>for</strong> copper lossLLF = 0.2 * LF + 0.8 *LF*LF= 0.3B = A x LIF= Rs. 89668 x E c x 0.3 = Rs. 26900 x E cWhere,A = Loading factor in Rs. Per kW of no load lossB = Loading factor in rs. Per kW <strong>for</strong> load lossH = No. of hours, the trans<strong>for</strong>mer will remain charged in a year i.e. no. of operation (taken as8400 hrs.)E c = Cost of energy to the utility at 11 kV levelr = Rate of ineterst per unit (taken as 8 %)n = expected life of the trans<strong>for</strong>mer (taken as 25 years)LLF = Loss load factor (where LLF = 0.2 x Load factor + 0.8 x L.F. 2 )LF = Load factor (taken as 0.5)E c = Cost of energy (in rupees per unit at 11 kV feeder level)Note: In case of non-availability of E c (energy cost per unit) at 11 kV feeder level, utilityshould consider the Bulk Rate Tariff plus 5% as the cost of energy at 11 kV feeder level.Load factor considered <strong>for</strong> B factor is 0.5, higher load factor may be considered <strong>for</strong> urbanareas.3-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!