13.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ii) Radio interface voltage (r.i.v.) testsiii) Temperature rise testsiv) Measurement of the resistance of the main circuitv) Short-time withstand current and peak withstand current testsvi) Mechanical and environmental testsvii) Miscellaneous provisions <strong>for</strong> making and breaking testsviii) Short circuit making and breaking testsix) Basic short circuit test dutiesx) Critical current testsxi) Single phase short making and breaking testsxii) Capacitive current switching testsxiii) Magnetizing and <strong>small</strong> inductive current switching tests7.2 Routine testsi) Power frequency voltage withstand dry tests on the main circuitii) Voltage withstand tests on control and auxiliary circuitsiii) Measurement of the resistance of the main circuitiv) Mechanical operating testsv) Design and visual checks8.0 Fault CalculationIn order to determine interrupting duty of circuit breakers it is necessity to determine faultcurrent at each circuit breaker location. Determination of maximum short circuit currentis the most important requirement of circuit breaker application. Rigorous determinationof short circuit current as a function of time involves complex calculations. Growth ininterconnecting power system as systems expand will increase short circuit duty.Accordingly some approximation and degree of judgment should be used.Different published methods of determining short circuit currents are available.Reference may be made to the following <strong>for</strong> details and selection.IEEE application guide <strong>for</strong> AC high voltage circuit breakers rated on a symmetricalcurrent basis IEEE std. C37010-1999.First step in carrying out short circuit studies is to determine system impedances withreference to the point of fault and current distribution <strong>for</strong> different kind of faults. Forpresent day large interconnected system this becomes time consuming laborious study.AC or DC network analyzer <strong>for</strong> calculation of fault current was previously frequentlyused <strong>for</strong> short circuit studies. In the analyzer all the essential elements of the powersystem were represented in a miniature replica and fault currents determined fromcalculation readings. In this method constant voltage behind sub transient/synchronousreactance were used as required. Accordingly real time studies to determine DC4-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!