10. 1.2/50 micro seconds impulse 325 kV (Peak) 170 kV (Peak) 75 kV (Peak)wave withstand test voltage11. One minute power frequency 2 kV 2 kV 2 kVwithstand test voltage onsecondary12. 3 second short time current As per IS: 3156 As per IS: 3156 12.5 kArelay13. Dynamic Rating As per IS: 3156 As per IS: 3156 2.5 times14. Minimum creepage distance ofbushings (based onAs per Para 2.5 of section 1environment)5.2 Temperature Risea) 36 kV & AboveThe maximum temperature of the windings, cores etc. should not exceed 45C overambient, while max. temperature of oil at top should not exceed 35C over ambient. ThePTs should be suitable <strong>for</strong> mounting on steel structures. All nuts, bolts, flanges and baseshould be hot dip galvanized. The terminal connectors should be such as to give intimatecontact between conductor & terminal and offer protection against and effects ofelectrolytic and atmospheric corrosion and should also have sufficient mechanicalstrength. The connectors should con<strong>for</strong>m IS 5556: 1970. The junction boxes should besuitable <strong>for</strong> terminating all the connections of the PTs secondaries with other equipmentsof the power station 400V grade terminal connectors of 15 Amp (continuous) currentrating should be provided.b) 12 kVWhen tested in accordance with IS: 3156, the temperature rise of the windings shall notexceed the following *table 2.5.2) limits:Class E insulationClass B insulationClass F insulation50 0 C600 0 C85 0 CNote: Maximum ambient temperature shall be taken as 65 0 C5.3 11 kV Voltage Trans<strong>for</strong>merThe tank shall be given three coats of rust preventing paint. The other iron parts shall behot dip galvanized. The tank shall be provided with lifting lugs either welded on the sidesor top cover plate of the tank.The dimensions and electrical characteristics of the 11 kV bushings shall be inaccordance with IS: 2099-1986 or its latest version.2-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!