5.17 Rated time quantities and operating sequenceRated values to be assigned to the following time quantities (fig. 3.6) will depend uponrated supply voltage reclosing operations etc.Opening time;Break time;Closing time;Open-close time;Reclosing time;Close-open time;Rated operating sequence is defined as follows:-o – t – co - t´ - coWhereo - opening operationco - closing operation followed immediately by an opening operation(without internal time delay)t,t´ - time interval between successive operation/ t& t˝ are in minutes orsecondsPower circuit breakers are rated <strong>for</strong> interrupting ability on the basis of a standardoperating duty.4-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!