Figure 12.1The waste management hierarchy12.3.2 Materials and wasteWaste generationAs the proposal involves removing a significant piece <strong>of</strong> transport infrastructure that extends forapproximately 3.6 kilometres and includes a number <strong>of</strong> built structures, it would result in thegeneration <strong>of</strong> large quantities <strong>of</strong> waste. Waste generated by the proposal would include:• structural steel from removal <strong>of</strong> track infrastructure, including beam and columns, as wellas steel associated with stations• concrete from removal <strong>of</strong> the footing pads and stations• electrical cabling from removal <strong>of</strong> wiring• industrial waste such as lubricating oils, hydraulic fluids and cleaning agents• transformers and associated infrastructure from substation decommissioning.The estimated quantities <strong>of</strong> the main waste types that would be generated are provided in Table12.2. These estimates were provided by Evans & Peck and are based on the removalmethodology outlined in section 5.Table 12.2 Estimated quantities <strong>of</strong> key waste types generated by theproposalType <strong>of</strong> waste Current use Estimated quantitySteel Beams 1,383 tonnesColumnsSteel reinforcingStations111 tonnes3 tonnes60 tonnesConcrete Pedestals 112 m 3Stations 300 m 3GHD | Transport for NSW - <strong>Monorail</strong> <strong>Removal</strong> <strong>Project</strong> <strong>REF</strong> | 119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!