- Page 1:
Monorail Removal ProjectReview of E
- Page 4 and 5:
This report has been prepared by GH
- Page 6 and 7:
6. Community and stakeholder consul
- Page 8 and 9:
Table 8.2 Listed heritage items wit
- Page 11 and 12:
Glossary of termsTermArterial roadB
- Page 13 and 14:
Executive summaryOverviewThis revie
- Page 15 and 16:
landowner. The concrete and reinfor
- Page 17 and 18:
What were the key issues raised?Key
- Page 19 and 20:
approval under the Heritage Act, wo
- Page 21 and 22:
BeforePhotomontage 2 - View along P
- Page 23:
espond to community feedback in a s
- Page 27 and 28:
1. Introduction1.1 OverviewIn March
- Page 29 and 30:
1.3 Purpose of the REFFor an activi
- Page 31:
NORTHSYDNEYMilsonsPointPort Jackson
- Page 34 and 35:
Station Location Ownership Position
- Page 36 and 37:
300PYRMONTHarboursideMurray StreetI
- Page 38 and 39:
(3) Development for the purposes of
- Page 40 and 41:
3.4.2 Roads Act 1993Under section 1
- Page 42 and 43:
Protected matterMatter located with
- Page 45:
Part B The proposalGHD | Transport
- Page 48 and 49:
As a result of these factors, the N
- Page 50 and 51:
would be difficult to increase the
- Page 52 and 53:
Further information on these work c
- Page 54 and 55:
Figure 5.2 Concept for phase 1 of w
- Page 56 and 57:
• Subject to finalising the detai
- Page 58 and 59:
• Phase 3 - Removal work• Phase
- Page 60 and 61:
• Phase 5 - Make good at street l
- Page 62 and 63:
ParameterPhase 5 Make good at stree
- Page 64 and 65:
• removal of contractor’s equip
- Page 66 and 67:
Work phasePhase 3 - Removalworks ab
- Page 68 and 69:
5.8.2 Work hoursBackgroundThe ‘In
- Page 70 and 71:
Work component/task Approximate dur
- Page 72 and 73:
6.2 Consultation during REF prepara
- Page 74 and 75:
Meeting type Agencies Date ofmeetin
- Page 76 and 77:
ActivityWebsiteLetter to government
- Page 79:
Part C Environmental impact assessm
- Page 82 and 83:
also supported by passenger surveys
- Page 84 and 85:
Figure 7.1 Local transport network
- Page 86 and 87:
Table 7.2 Cycle infrastructure in t
- Page 88 and 89:
Maintenance Workshop. Traffic gener
- Page 90 and 91:
arrive at the site before 10pm and
- Page 92 and 93:
7.3.10 Potential long term impactsT
- Page 94 and 95:
- Detours associated with road clos
- Page 96 and 97:
Table 8.1 Heritage items in the stu
- Page 98 and 99:
Table 8.2 Listed heritage items wit
- Page 100 and 101:
Map ref(figure8.1)Item name Address
- Page 102 and 103:
minimise potential impacts on herit
- Page 104 and 105:
• A detailed work method statemen
- Page 106 and 107:
• Darling Park Station.Noise moni
- Page 108 and 109:
As the work duration would be limit
- Page 110 and 111:
ReceiverExternal noisecriteria (dBA
- Page 112 and 113:
Table 9.6 Assessment of impacts of
- Page 114 and 115:
Table 9.8 Heritage listed buildings
- Page 116 and 117:
CriteriaL Aeq(15 min) noise level a
- Page 118 and 119:
Table 10.1Urban character areasUrba
- Page 120 and 121:
10.2.2 Visual elements of the Monor
- Page 122 and 123:
Darling Drive facing westDarling Dr
- Page 124 and 125:
Table 10.2Long term visual impactsU
- Page 126 and 127:
Existing viewPotential view followi
- Page 129 and 130:
11. Socio-economics and land use11.
- Page 131 and 132:
Table 11.1Overview of land uses in
- Page 133 and 134:
King StreetDarlingHarbourYork Stree
- Page 135 and 136:
There are approximately 20,000 busi
- Page 137 and 138:
Long term impactsThe main potential
- Page 139:
• Further consultation with relev
- Page 142 and 143: • resource use and materials• p
- Page 144 and 145: Relevant sustainability targets and
- Page 146 and 147: Approach to management of wasteThe
- Page 148 and 149: continuous improvement and innovati
- Page 150 and 151: • Methods for management of emiss
- Page 152 and 153: There is potential for lead paint t
- Page 154 and 155: The works undertaken as part of the
- Page 157: Part D ConclusionGHD | Transport fo
- Page 160 and 161: selected to undertake work would be
- Page 162 and 163: IDnumberMitigation measureSensitive
- Page 164 and 165: IDnumberMitigation measurepre-start
- Page 166 and 167: IDnumberMitigation measureM.1 The p
- Page 168 and 169: • development of a detailed waste
- Page 171: 16. Reference listAustralian Bureau
- Page 175: Appendix A Photographic inventoryGH
- Page 178 and 179: Covered walkway from Convention Sta
- Page 180 and 181: Galeries Victoria StationGaleries V
- Page 183 and 184: Table B.1 Heritage items in the stu
- Page 185 and 186: Map ref(figure8.1)Item name and add
- Page 187 and 188: Map ref(figure8.1)Item name and add
- Page 189: Appendix C Clause 228 and ecologica
- Page 195 and 196: GHD133 Castlereagh St Sydney NSW 20