13.07.2015 Views

Monorail Removal Project - Review of Environmental Factors (REF)

Monorail Removal Project - Review of Environmental Factors (REF)

Monorail Removal Project - Review of Environmental Factors (REF)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C.1 Clause 228 considerationsClause 228 factor Summary <strong>of</strong> results Potentialimpact(a) Any environmentalimpact on a community(b) Any transformation <strong>of</strong> alocality(c) Any environmentalimpact on the ecosystems<strong>of</strong> the locality(d) Any reduction <strong>of</strong> theaesthetic, recreational,scientific or otherenvironmental quality orvalue <strong>of</strong> a locality(e) Any effect on a locality,place or building havingaesthetic, anthropological,archaeological,architectural, cultural,historical, scientific orsocial significance or otherspecial value for present orfuture generationsf) Any impact on the habitat<strong>of</strong> protected fauna (withinthe meaning <strong>of</strong> the NationalParks and Wildlife Act1974)(g) Any endangering <strong>of</strong> anyspecies <strong>of</strong> animal, plant orother form <strong>of</strong> life, whetherliving on land, in water or inthe air(h) Any long-term effectson the environmentThe proposal has the potential to result in amenity relatedimpacts in the vicinity <strong>of</strong> the works. These impacts wouldbe managed through the implementation <strong>of</strong> the proposalenvironmental management plan. No long termenvironmental impacts are predicted.Both positive and negative impacts to the aesthetics andcharacter <strong>of</strong> the study area were identified. In the shortterm, the proposal would result in impacts as a result <strong>of</strong>removal works and the presence <strong>of</strong> machinery and plant. Inthe long term, removal <strong>of</strong> the <strong>Monorail</strong> would provide apositive visual impact on the locality.No ecosystem impacts were identified.The proposal had the potential to impact on amenity in theshort term as a result <strong>of</strong> the removal activities. The limitednature <strong>of</strong> the proposed surface works would limit thepotential significance <strong>of</strong> these impacts. In the long term, nonegative impacts on the aesthetic, recreational, scientific orother environmental qualities <strong>of</strong> the study area werepredicted, with the exception <strong>of</strong> the positive change to thevisual character <strong>of</strong> the area.There are a number <strong>of</strong> heritage listed items along theproposal site and in the study area, including the Stateheritage listed Pyrmont Bridge. Works in the vicinity <strong>of</strong>heritage items would be carefully managed to minimise thepotential for impacts to these items. If appropriatelymanaged, works on Pyrmont Bridge are unlikely to impacton the significance <strong>of</strong> the bridge. <strong>Removal</strong> <strong>of</strong> the <strong>Monorail</strong>structure has the potential to positively impact on thebridge. An approval for works to the bridge has beensought under section 60 <strong>of</strong> the Heritage Act.No impacts on protected fauna within the meaning <strong>of</strong> theNational Parks and Wildlife Act 1974 were predicted.The proposal would not endanger any species <strong>of</strong> plant,animal or other form <strong>of</strong> life.The local community has identified the potential for localimpacts on amenity during the proposal. The <strong>REF</strong> includesrecommendations for management measures to addressthe issues identified. No long term impacts on theenvironment have been identified.Short term –negativeLong term –noneShort term –negativeLong term –positiveNoneShort term –minor negativeLong term –none, other thanpotential changein characterShort term –none ifmanagementmeasuresapplied.Mitigationsmeasures arerecommendedby the <strong>REF</strong>Long term –positiveNoneNoneMitigationmeasuresrecommendedby the <strong>REF</strong> inrelation to shortterm impacts.GHD | Report for Transport for NSW - <strong>Monorail</strong> <strong>Removal</strong> <strong>Project</strong>, 21/21903

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!