13.07.2015 Views

Monorail Removal Project - Review of Environmental Factors (REF)

Monorail Removal Project - Review of Environmental Factors (REF)

Monorail Removal Project - Review of Environmental Factors (REF)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Further information on these work components is provided in the following sections.5.2 Work component 1 - DecommissioningDecommissioning would be undertaken by the current operator <strong>of</strong> the <strong>Monorail</strong> (Veolia) andwould involve the following:• remove all train sets from the rail tracks and transport them to:– a temporary storage location (train sets may be temporarily stored prior to reuse,recycling or disposal), or– a recycling/disposal facility, or– to interested parties for reuse.• terminate all ticketing systems• terminate all control systems• terminate all power supplies• decommission the interface systems on Pyrmont Bridge so that the bridge can openfreely prior to the <strong>Monorail</strong>’s removal.5.3 Work component 2 - <strong>Removal</strong> <strong>of</strong> track spans, columns andfoundationsThis work component would involve two phases <strong>of</strong> work, depicted in Figure 5.1 and describedbelow:• Phase 1 – <strong>Removal</strong> <strong>of</strong> structural steel items• Phase 2 – Concrete removal and civil works.Figure 5.1 <strong>Removal</strong> phases for work component 226 | GHD | Transport for NSW - <strong>Monorail</strong> <strong>Removal</strong> <strong>Project</strong> <strong>REF</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!