13.07.2015 Views

Monorail Removal Project - Review of Environmental Factors (REF)

Monorail Removal Project - Review of Environmental Factors (REF)

Monorail Removal Project - Review of Environmental Factors (REF)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• identification <strong>of</strong> services and their locations• installation <strong>of</strong> 3 metres wide pedestrian walkway and separation <strong>of</strong> <strong>Monorail</strong> workface onbridge• installation <strong>of</strong> security fencing and works signage• establishment <strong>of</strong> demolition contractor on site• establishment <strong>of</strong> crane and truck parking area on western on-ramp to bridge• establishment <strong>of</strong> below-deck access or make modifications to existing access to makesafe the access required for enabling works below deck.• coordination with SHFA and other stakeholders• prepare for removal works vehicle/plant access, and traffic management setup.Phase 2 would involve carrying out the following initial work:• termination <strong>of</strong> services, removal <strong>of</strong> cabling and ancillary equipment• termination <strong>of</strong> and removal <strong>of</strong> hydraulic rams for swing span <strong>Monorail</strong>• removal <strong>of</strong> submarine cabling to the <strong>Monorail</strong>• installation <strong>of</strong> protection barricades for rail beam and column removal• removal <strong>of</strong> fittings and fixtures on columns.Phase 3 would involve removal <strong>of</strong> the following above deck:• rail beams• signs, fixtures and lighting for disposal or reuse• hydraulic machinery platform• bridge cabin• block seats and lifting rams• power conduits and boxes• electronic ‘stop don’t walk’ signal• shared path signage.Phase 4 would involve removal <strong>of</strong> the following below deck:• support column (lifted from deck level)• column M108 including perspex and steel feature• base plates <strong>of</strong> columns• fluoro lighting below deck• hydraulic piping system• any structural elements below deck level related to the <strong>Monorail</strong> service and not directlyaffecting the Pyrmont Bridge structure (cable trays, support beams, etc).Phase 5 would involve cleaning up and making good, including:• make good <strong>of</strong> bridge elements below deck, where affected by <strong>Monorail</strong> removal works• form, reo and pour deck infills at <strong>Monorail</strong> column locations• make good expansion joints at clash with <strong>Monorail</strong> columnsGHD | Transport for NSW - <strong>Monorail</strong> <strong>Removal</strong> <strong>Project</strong> <strong>REF</strong> | 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!