13.07.2015 Views

2003 US Army BRADLEY GUNNERY 503p.pdf - Survival Books

2003 US Army BRADLEY GUNNERY 503p.pdf - Survival Books

2003 US Army BRADLEY GUNNERY 503p.pdf - Survival Books

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FM 3-22.1TASK 3APPLY IMMEDIATE ACTION ON A 25-MM GUNCONDITIONSGiven a Bradley with BII, 25-mm dummy ammunition loaded, and a 25-mm gun thatfails to fire.STANDARDSWithin 1 minute, the crewmember applied immediate action so that the 25-mm gunwould fire.EVALUATION PROCEDURES1. Administrative Process. At this task, the evaluator logs information about eachcrewmember on a roster. He supplies the crewmember with all required materials andequipment, displaying them IAW this manual. He uses the performance measures torecord the crewmember's performance. Afterward, he tells the crewmember how wellthe crewmember performed on this task and directs him to the next task or to furthertraining. One evaluator can test one--and only one--crewmember at a time.2. Procedures Used When Personnel Receive a NO GO. If a crewmember fails toachieve the standards on the performance measures, he earns a NO GO. When thishappens, the evaluator explains to the crewmember what he did wrong and how tocorrect his mistakes. Then, he retests the crewmember IAW local SOP.PERSONNEL, EQUIPMENT, AND MATERIALS• Qualified 11B, 12B, 13F, 14R, or 19D, sergeant or above.• Operational M2, M2A2, or M2A2 ODS; M2A3, M3, M3A2, or M3A2 ODS; M3A3 with BII.• TM 9-2350-284-10-2, TM 9-2350-252-10-2, or TM 9-2350-294-10-2-1.• FM 3-22.1.• 90 rounds of 25-mm dummy ammunition.• Stopwatch.• Clipboard with pen.• One helper, qualified 11B, 12B, 13F, 14R, or 19D, sergeant or below.PRETEST PREPARATION1. Ensure master power is on.2. After examinee enters turret, turn on turret power and turret drive.3. Ensure turret tools are present and stowed properly.4. Ensure 25-mm feeder is loaded.PRETEST CONDITIONS FOR EACH EXAMINEE1. Ensure all power is on.2. Ensure that bolt and bolt position indicators are in SEAR position.TEST PLANNING TIMEAdministration 5 minutesTest1 minuteTotal6 minutesA-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!