13.07.2015 Views

2003 US Army BRADLEY GUNNERY 503p.pdf - Survival Books

2003 US Army BRADLEY GUNNERY 503p.pdf - Survival Books

2003 US Army BRADLEY GUNNERY 503p.pdf - Survival Books

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FM 3-22.1TASK 11LOAD AND UNLOAD THE 25-MM HE READY BOXCONDITIONSGiven a Bradley with the turret positioned at HE load and 75 rounds of 25-mm dummyammunition.STANDARDSThe crewmember--1. Within 6 minutes, loaded 75 rounds in the HE ready box.2. Within 6 minutes, unloaded 75 rounds from the HE ready box and separatedammunition into five 15-round belts.EVALUATION PROCEDURES1. Administrative Process. At this task, the evaluator logs information about eachcrewmember on a roster. He supplies the crewmember with all required materials andequipment, displaying them IAW this manual. He uses the performance measures torecord the crewmember's performance. Afterward, he tells the crewmember how wellthe crewmember performed on this task and directs him to the next task or to furthertraining. One evaluator can test one--and only one--crewmember at a time.2. Procedures Used When Personnel Receive a NO GO. If a crewmember fails toachieve the standards on the performance measures, he earns a NO GO. When thishappens, the evaluator explains to the crewmember what he did wrong and how tocorrect his mistakes. Then, he retests the crewmember IAW local SOP.PERSONNEL, EQUIPMENT, AND MATERIAL REQUIRED• Qualified 11B, 12B, 13F, 14R, or 19D, sergeant or above.• Operational M2, M2A2, M2A2 ODS, M2A3 or M3, M3A2, M3A2 ODS, or M3A3 with BII.• TM 9-2350-284-10-2, TM 9-2350-252-10-2, or TM 9-2350-294-10-2-1.• 75 rounds of 25-mm dummy ammunition.• FM 3-22.1.• Stopwatch.• Clipboard with pen.• One helper, qualified 11B, 12B, 13F, 14R, or 19D, sergeant or below.PRETEST PREPARATION1. Position turret at HE load position with travel lock engaged.2. Place five 15-round belts of 25-mm dummy ammunition on the floor of the hull to therear of the turret shield door.3. Inspect HE ready-box door for serviceability; replace all unserviceable ormissing parts.PRETEST CONDITIONS FOR EACH EXAMINEEEnsure--1. Turret position is in HE load position.2. Master power and turret power are both off.3. HE ready can door is secured.A-50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!