13.07.2015 Views

TEFI TCA – id. code 3919 Final report INDEX INTRODUCTION I ...

TEFI TCA – id. code 3919 Final report INDEX INTRODUCTION I ...

TEFI TCA – id. code 3919 Final report INDEX INTRODUCTION I ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TEFI</strong> <strong>TCA</strong> – <strong>id</strong>. <strong>code</strong> <strong>3919</strong>CHAPTER 5EVALUATION5.1 Italian evaluation: from the <strong>TCA</strong> beginning toMetz transnational meeting (November 2005)5.1.1 Monitoring and evaluation activitiesThe “monitoring and evaluation” activity is aimed at verifying andevaluating the activities of the project that have been carried out, inregard to the quality and pertinence of the results that have beenreached, as well as to the efficaciousness and efficiency of theoperative methods and organization.The feedback obtained will be used exclusively for eventualmodifications, updating and readjustments of the organization andmethods used in the field, to reach the correct standards andefficiency for the project.The monitoring process and following actions of evaluation are mainlyaimed at:1. a comparison between the results reached and the aims of theproject as defined by the partnership;<strong>Final</strong> <strong>report</strong> 233

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!