07.12.2012 Views

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>BoR</strong> (<strong>11</strong>) <strong>06b</strong><br />

information on roll-out of new infrastructures or technologies per geographical area. A<br />

reasonable window of announcement is necessary to create a level playing field on the<br />

retail market”.<br />

- Explain if such provisions are applied and what they look like.<br />

The actual plan of new ODFs and street cabinets has to be published and kept updated on<br />

the SMP operator's website.<br />

<strong>NGA</strong> network development plans have to be published on the SMP operator's website 6<br />

months before starting deployment (to ensure time for the alternative operators to require<br />

multiple fibre deployment).<br />

- Elaborate on your practical experiences with such provisions (e.g. have there been any<br />

practical problems with enforcing such provisions?).<br />

We don't have practical experiences with such provisions yet.<br />

� Are there any provisions dealing with stranded assets? Investments by alternative<br />

operators get sunk if the closure of MDFs implies that pay-back periods are shorter than<br />

initially expected. Are there any measures in place to solve the problem of stranded assets<br />

and what do they look like (e.g. compensation schemes 5 )?<br />

The SMP operators are obliged to announce 5 years in advance the decommissioning of<br />

MDFs so as to protect the investments of the alternative operators.<br />

� Are there any provisions relating to the costs of migration? E.g., how are the costs of<br />

migration split between the SMP operator and the competitors?<br />

There are no specific provisions.<br />

5 Transparency regarding civil engineering infrastructure<br />

� Art. 17 of the Draft <strong>NGA</strong> Recommendation foresees the establishment of a database<br />

containing information on (e.g.) geographical location, available capacity of all ducts 6 . In<br />

case such a database exists already in your country, explain:<br />

Currently there is no such obligation in place.<br />

5 See <strong>BoR</strong> (10) 08, Ch. E.2.<br />

6 Note: In its Opinion to this Draft Recommendation <strong>BEREC</strong> suggested to replace “all ducts” with<br />

“civil engineering infrastructure”.<br />

129

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!