07.12.2012 Views

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>BoR</strong> (<strong>11</strong>) <strong>06b</strong><br />

- Elaborate on your practical experiences with such provisions (e.g. have there been<br />

any practical problems with enforcing such provisions?).<br />

-<br />

� Are there any provisions dealing with stranded assets? Investments by alternative<br />

operators get sunk if the closure of MDFs implies that pay-back periods are shorter than<br />

initially expected. Are there any measures in place to solve the problem of stranded assets<br />

and what do they look like (e.g. compensation schemes 5 )?<br />

No.<br />

� Are there any provisions relating to the costs of migration? E.g., how are the costs of<br />

migration split between the SMP operator and the competitors?<br />

No.<br />

5 Transparency regarding civil engineering infrastructure<br />

� Art. 17 of the Draft <strong>NGA</strong> Recommendation foresees the establishment of a database<br />

containing information on (e.g.) geographical location, available capacity of all ducts 6 . In<br />

case such a database exists already in your country, explain:<br />

- Who established/runs this database: the NRA or another institution, possibly in cooperation<br />

with the NRA?<br />

The Ministry which is also responsible for electronic communications (MVZT) runs a<br />

database on all public infrastructure, which should include also information on ducts, but<br />

only information on locations and no specific information on available capacity.<br />

- Which data are collected in this database?<br />

See above.<br />

- Does the information collected cover just telcos or also non-telcos?<br />

Non-telcos as well.<br />

5 See <strong>BoR</strong> (10) 08, Ch. E.2.<br />

6 Note: In its Opinion to this Draft Recommendation <strong>BEREC</strong> suggested to replace “all ducts” with<br />

“civil engineering infrastructure”.<br />

287

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!