07.12.2012 Views

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.2 Concentration point/ manhole unbundling<br />

a)–g) N/A.<br />

3.3 Cabinet unbundling<br />

a) Available in a mandated basis (access to copper sub-loop).<br />

<strong>BoR</strong> (<strong>11</strong>) <strong>06b</strong><br />

b) Sub-loop Unbundling (SLU) is possible and it is explicitly foreseen in PT‟s reference<br />

unbundling offer (RUO), although there are no unbundled sub-loops to date. It is subject<br />

to the same generic rules as LLU, but there may be a lack of detail as how SLU would<br />

apply in practice, mainly concerning prices and co-location conditions. I.e., details<br />

concerning co-location in street cabinets have not been determined (e.g. regarding space<br />

availability inside or close to the street cabinet, etc.).<br />

c) SLU is “included” in Market 4 (previously in Market <strong>11</strong>).<br />

d) Having analysed the Market <strong>11</strong> (in 2005), ANACOM imposed to PT the following<br />

obligations: “Access to and use of specific resources networks” (e.g. grant access to local<br />

loops and sub-loops and associated resources); “Transparency in the publication of<br />

information, including reference offers” (e.g. publication of the RUO - ORALL); “Nondiscrimination<br />

in the provision of access and interconnection”; “Separation of accounts for<br />

specific activities”; “Price control and cost accounting” (e.g. set cost-oriented prices); and<br />

“Financial Reporting”.<br />

In 2005, it was imposed to PT, the SMP operator, the publication of the reference offer for<br />

Local Loop Unbundling (including SLU). However, ORALL (the RUO) is available to<br />

alternative operators since 2001.<br />

e) To date, prices of LLU and associated resources have been regulated according to the<br />

principle of cost orientation of prices. ANACOM has based its estimates of costs on: (a)<br />

the analytical accounting system of PTC, audited annually; (b) the budgeted costs and the<br />

current costs of resources consumed and activities needed for the provision of services;<br />

and also with reference to practices in the European Union. In assessing prices<br />

consideration is also given to the criteria of economic efficiency.<br />

f) There are no unbundled sub-loops to date and no pricing is defined.<br />

g) ANACOM considered, in its analysis of Market 4, that the maintenance of the obligation to<br />

grant access to local loops and sub-loops and associated resources, including the “signal<br />

244

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!