07.12.2012 Views

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

BoR (11) 06b BEREC report NGA Country Cases - IRG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

d) Market 4.<br />

e) An effective reference offer is in force since July 2006 4 .<br />

<strong>BoR</strong> (<strong>11</strong>) <strong>06b</strong><br />

� After the Market 4 analysis in 2009, ANACOM has imposed to PT, the SMP operator,<br />

several obligations, namely “Access to and use of specific resources networks”<br />

(access to ducts), non-discrimination and “Transparency in the publication of<br />

information, including reference offers” (publication of the ORAC, clear identification of<br />

the amendments made to the offer, prior notice of 30 days of changes in supply,<br />

provision and publication of indicators and performance levels in respect of quality of<br />

service in wholesaler offers and provision to operators of detailed and timely<br />

information on developments in the access network).<br />

� The ORAC is currently used by 16 undertakings. Since the introduction of that offer<br />

more than 4,800 information requests and more than 10,000 viability requests were<br />

made (until 2009).<br />

f) ANACOM's assessment of ducts and associated infra-structure prices was based on cost<br />

estimations, derived from the PTC's Cost Accounting System (a top-down, historic costs,<br />

FDC and ABC-type model). Costs for new services, which were not available at the cost<br />

accounting system, were estimated based on current costs, taking into consideration<br />

equipment and manpower costs and, when applicable, mark-ups for operating,<br />

maintenance and common costs were added 5 .<br />

g) A price list is publicly available, and ducts‟ (und subducts‟) price is quoted in €/m/cm² and<br />

month. In August 2008, ANACOM defined the price for access to the duct database 6 .<br />

h) By determination of 17 November 2009, ANACOM has approved a draft decision 7 on the<br />

amendments to the reference ducts access offer, imposing several changes:<br />

improvements on the access (and QoS) to the “duct database” (on an Extranet), access to<br />

poles and other PT infra-structures, an IT system for handling requests and more strict<br />

QoS parameters and compensations to be paid to operators (in case of non compliance<br />

with the SLA). The final decision will be issued very soon.<br />

4 See the current version of this offer (in Portuguese) in<br />

http://ptwholesale.telecom.pt/GSW/PT/Canais/ProdutosServicos/OfertasReferencia/ORAC/ORAC.htm.<br />

5 A detailed explanation of ANACOM's approach can be found in the <strong>report</strong> of the prior hearing<br />

granted to interested parties of 26th of May of 2006 in<br />

http://www.anacom.pt/streaming/Prior_hearing_<strong>report</strong>_26june2006.pdf?categoryId=38<strong>11</strong>8&contentId=374927<br />

&field=ATTACHED_FILE.<br />

6 Anacom has required PT to establish a suitable database (Extranet). This database is to contain<br />

location and space information. Access to this database resource is operational since January<br />

2008.<br />

7 See http://www.anacom.pt/render.jsp?contentId=994322&languageId=1.<br />

241

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!