Financial Statement<br />
FG Hydro shall generate and deliver to these customers the contracted energy on a monthly<br />
basis. FG Hydro is bound to service these customers until the end of the stipulated terms, the range<br />
of which falls between August 2018 to December 2020.<br />
Upon expiration, these contracts may be renewed upon renegotiation with the customers and due<br />
process as stipulated by the ERC. As of December 31, <strong>2016</strong>, there are three (3) remaining PSCs<br />
being serviced by FG Hydro.<br />
Details of the existing contracts of FG Hydro are as follows:<br />
Related Contracts Expiry Date Other Developments<br />
Nueva Ecija II Electric Cooperative,<br />
Inc., Area 1 (NEECO II-Area 1)<br />
August 25, 2018 The ERC granted a provisional approval of<br />
the PSC between FG Hydro and NEECO II<br />
Area 1 that took effect on January 13, 2014.<br />
Nueva Ecija II Electric Cooperative,<br />
Inc., Area 2 (NEECO II - Area 2)<br />
December 25, <strong>2016</strong> The contract with NEECO II - Area 2 was not<br />
renewed.<br />
Edong Cold Storage and Ice Plant<br />
(ECOSIP)<br />
National Irrigation Administration<br />
(NIA) Upper Pampanga River<br />
Integrated Irrigation System<br />
(NIA- U<strong>PR</strong>IIS)<br />
December 25, 2020<br />
October 25, 2020<br />
A new agreement was signed by FG Hydro<br />
and ECOSIP in November 2010 for the<br />
supply of power in the succeeding ten years.<br />
FG Hydro and NIA-U<strong>PR</strong>IIS signed a new<br />
agreement in October 2010 for the supply of<br />
power in the succeeding ten years.<br />
PAMES December 25, 2008 There was no new agreement signed between<br />
FG Hydro and PAMES. However, FG Hydro<br />
had continued to supply PAMES’ electricity<br />
requirements with PAMES’ compliance to<br />
the agreed restructured payment terms.<br />
In addition to the above contracts, FG Hydro entered into a PSC with First Gen Energy Solutions,<br />
Inc. The PSC commenced on February 26, <strong>2016</strong> and will remain effective until February 25, 2018.<br />
FG Hydro also entered into a PSC with BGI for the supply of replacement power to FG Hydro. The<br />
contract is for a period of thirty months, commencing on February 26, <strong>2016</strong> and effective until<br />
August 25, 2018.<br />
Operation and Maintenance Agreement (O&M Agreement)<br />
In 2006, FG Hydro entered into an O&M Agreement with NIA, with the conformity of the NPC.<br />
Under the O&M Agreement, NIA will manage, operate, maintain and rehabilitate the<br />
Non-Power Components of the PAHEP/MAHEP in consideration for a service fee based on actual<br />
cubic meter of water used by FG Hydro for power generation.<br />
In addition, FG Hydro will provide for a Trust Fund amounting to ₱100.0 million within the first<br />
two years of the O&M Agreement. The amortization for the Trust Fund is payable in 24 monthly<br />
payments starting November 2006 and is billed by NIA in addition to the monthly service fee.<br />
The Trust Fund has been fully funded since October 2008.<br />
The O&M Agreement is effective for a period of 25 years commencing on November 18, 2006<br />
and renewable for another 25 years under the terms and conditions as may be mutually agreed<br />
upon by both parties.<br />
Total service fees incurred amounted to ₱100.2 million, ₱90.6 million and ₱81.1 million in <strong>2016</strong>,<br />
2015 and 2014, respectively, and are included under the “Cost of sale of electricity” account in the<br />
statements of income (see Note 21).<br />