02.02.2018 Views

Practical_modern_SCADA_protocols_-_dnp3,_60870-5_and_Related_Systems

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Basic application functions:<br />

9.2.3 Certification <strong>and</strong> testing<br />

Advanced considerations of IEC <strong>60870</strong>-5 299<br />

• Station initialization<br />

• Cyclic data transmission<br />

• Read procedure<br />

• Spontaneous transmission<br />

• Double transmission; list of type numbers<br />

• Station interrogation; checkbox list for groups 1–16 <strong>and</strong> global<br />

• Clock synchronization<br />

• Comm<strong>and</strong> transmission<br />

• Transmission of integrated totals<br />

• Parameter loading<br />

• Parameter activation<br />

• Test procedure<br />

Unlike for DNP3, there is no authority to provide certification of IEC <strong>60870</strong>-5 compliance<br />

authorized directly by the IEC. However, there are commercial testing laboratories that do<br />

offer testing to this st<strong>and</strong>ard.<br />

At website http://www.trianglemicroworks.com/iec<strong>60870</strong>-5 the ‘Implementers of<br />

IEC <strong>60870</strong>-5’ page lists consultants including firms offering compliance testing to the<br />

st<strong>and</strong>ard. Also listed are firms that offer test sets that may be used for system testing.<br />

These include ASE, Cybertec, FGH, KEMA, PTI <strong>and</strong> Tele-Data.<br />

9.3 Other information sources<br />

IEC <strong>60870</strong>-5 has no official user group, however there is a mail-list where a number<br />

of members of the IEC working group <strong>and</strong> other technical experts discuss <strong>and</strong> answer<br />

questions about the <strong>protocols</strong>.<br />

This can be accessed from the trianglemicroworks website:<br />

• http://www.trianglemicroworks.com/iec<strong>60870</strong>-5/index.htm<br />

This site has a substantial list of implementers of the protocol, grouped by equipment<br />

type category in a similar manner to that available at the DNP3 website. It also provides<br />

access to technical papers <strong>and</strong> discussion records.<br />

The following information about the mail-list is repeated from the website:<br />

• The mail-list was established as a result of discussions at the IEC Technical<br />

Committee 57 Working Group 03 meeting in Lucerne (April 1998) concerning<br />

the likely interoperability of products claiming to conform to IEC<br />

<strong>60870</strong>-5-101, the desire of users to obtain ‘plug <strong>and</strong> play’ products, <strong>and</strong> how<br />

best to help users <strong>and</strong> suppliers interpret the st<strong>and</strong>ard in a consistent way. The<br />

objective of the mail-list is to create a place implementers <strong>and</strong> users of IEC<br />

<strong>60870</strong>-5 can discuss different interpretations of the specifications in an effort<br />

to establish a consensus opinion on each topic. The mail-list is open to anyone<br />

with an interest in IEC <strong>60870</strong>-5 <strong>and</strong> there are no membership fees.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!