13.04.2018 Views

ECOBuilder-Specifiers Journal spring2018

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

around to suit the direction of arrivals<br />

from the south and creating a new link<br />

bridge. This bridge also incorporates a<br />

stage for performances.<br />

Also in the basement, spare capacity<br />

within the Loading Bay beneath the<br />

1980’s building, adjacent the Vaults,<br />

was utilised to extend the restaurant<br />

and entertainment offer and to create<br />

a vertical link to the shopping centre<br />

and cinema above.<br />

Finally the obstruction of the 1980’s<br />

atrium has been replaced by a simple<br />

volume of glass and steel that unites<br />

all four components of the building –<br />

the 1980’s shopping centre north, the<br />

Market Hall to the south, the Vaults<br />

beneath and the cinema above – in<br />

plan and section. New escalators and<br />

lift link every level whilst views are<br />

opened up between the main entrance<br />

up to the cinema foyer, through to the<br />

north Mall and down to the Vaults.<br />

Throughout the process the design<br />

team has worked closely with the<br />

Planning Department, Conservation<br />

Officer and Historic England to ensure<br />

that the proposals were designed<br />

and developed in the best interests<br />

of the historic building whilst<br />

accommodating new commercial<br />

uses. breathing new life into the<br />

building, re-establishing Bolton Town<br />

Centre as a destination of choice and<br />

opening up an important piece of<br />

Bolton’s heritage to the citizens of the<br />

town for the first time.<br />

52 SPECIFIERS JOURNAL - SPRING 2018

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!