17.01.2019 Views

Comprehesive Boiler Manual Jan 2019

A Preview of B&CT Training LLC - Boiler Systems I & II Comprehensive Training Manual. We can customize training manuals to include your specific equipment. The outline is specifically designed to assist with compliance to V.A. Handbook 1810 requirements. For more information please call 405-401-0156 or see www.b-ct.net

A Preview of B&CT Training LLC - Boiler Systems I & II Comprehensive Training Manual. We can customize training manuals to include your specific equipment. The outline is specifically designed to assist with compliance to V.A. Handbook 1810 requirements. For more information please call 405-401-0156 or see www.b-ct.net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Slime Buildup on RO Membrane<br />

Fouling<br />

With chlorine removed, membranes are a<br />

great place for bacteria slime to grow<br />

which can plug up the system.<br />

Non-Oxidizing Biological Control Chemicals do not damage RO membranes. They<br />

are typically much more expensive than the oxidizing type.<br />

Scale Buildup on RO Membrane<br />

Organic phosphates disrupt crystal<br />

formation and extend the time<br />

between membrane changeout.<br />

(same chemical and process used in<br />

cooling towers to prevent scale)<br />

Normalized Permeate Flow (NPF) = the amount of permeate water that the RO is producing<br />

P a g e 161

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!