17.01.2019 Views

Comprehesive Boiler Manual Jan 2019

A Preview of B&CT Training LLC - Boiler Systems I & II Comprehensive Training Manual. We can customize training manuals to include your specific equipment. The outline is specifically designed to assist with compliance to V.A. Handbook 1810 requirements. For more information please call 405-401-0156 or see www.b-ct.net

A Preview of B&CT Training LLC - Boiler Systems I & II Comprehensive Training Manual. We can customize training manuals to include your specific equipment. The outline is specifically designed to assist with compliance to V.A. Handbook 1810 requirements. For more information please call 405-401-0156 or see www.b-ct.net

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

iv. TDS Control: Surface blowdown<br />

iv. Surface blowdown<br />

b<br />

Surface Blowdown :<br />

High TDS can increase surface tension<br />

of water creating bubbles with “super<br />

skins”, increasing chances of priming<br />

(boiler water escaping as droplets and<br />

traveling with steam), carryover (solids<br />

resulting from priming) and bouncing<br />

(fast irregular fluctuations in boiler<br />

water level).<br />

Best TDS control, bubbles are popping on the<br />

surface leaving their solids behind (highest TDS<br />

concentration in boiler).<br />

Surface (Continuous)<br />

Blowdown Valve (Skimmer):<br />

Motorized Actuator<br />

TDS probe<br />

General Recommendation for max TDS:<br />

Two pass economic<br />

4500 ppm<br />

Packaged and 3-Pass 3000 - 3500<br />

Low pressure water tube 2000 – 3000<br />

Steam generators (Coil type boilers) 2000<br />

Medium pressure water tube 1500<br />

High Pressure water tube 1000<br />

Consult your manufacturer for<br />

exact specifications.<br />

P a g e 170

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!