17.01.2019 Views

Comprehesive Boiler Manual Jan 2019

A Preview of B&CT Training LLC - Boiler Systems I & II Comprehensive Training Manual. We can customize training manuals to include your specific equipment. The outline is specifically designed to assist with compliance to V.A. Handbook 1810 requirements. For more information please call 405-401-0156 or see www.b-ct.net

A Preview of B&CT Training LLC - Boiler Systems I & II Comprehensive Training Manual. We can customize training manuals to include your specific equipment. The outline is specifically designed to assist with compliance to V.A. Handbook 1810 requirements. For more information please call 405-401-0156 or see www.b-ct.net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

For Residual Hardness that the softener (or demin plant) did not get:<br />

ii. Scale Control: Residual Hardness<br />

Molybdate(MoO 4<br />

-3<br />

) removes residual hardness and forms a soft sludge (easy to blowdown).<br />

10Ca +2 + 6MoO 4<br />

-3<br />

+ 2OH - → 3Ca 3(MoO 4) 2·Ca(OH) 2<br />

blowndown as soft sludge<br />

OH Alkalinity is necessary in order for the above reaction to take place.<br />

Phosphates (PO 4)<br />

Plus<br />

Alkalinity (OH)<br />

Polymers are added which attach to the<br />

phosphate complex, making a chain which<br />

becomes heavy and falls to the bottom<br />

and then is blown down as sludge<br />

Molybdates (Moly) and<br />

phosphates are generally<br />

determined with a colorimeter<br />

Scale Control chemicals are typically<br />

injected into feed water line<br />

P a g e 168

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!