21.12.2012 Views

WARNING - Flannery Plant Hire

WARNING - Flannery Plant Hire

WARNING - Flannery Plant Hire

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2<br />

3<br />

Bucket and Link Pins<br />

--- every 100 hours<br />

MAINTENANCE<br />

Grease all submerged pins after operating in water.<br />

Blade Pins (ZX27-3)<br />

--- every 500 hours or every year<br />

• Blade connecting pin<br />

• Blade cylinder rod end and bottom<br />

Precautions for Front Attachment and Blade Removal<br />

1. When pins are removed to replace the front attachment<br />

or blade, do not attempt to clean the bore insides of the<br />

bushings.<br />

2. Before installing the front attachment or the blade, apply<br />

grease sufficiently to the pin-boss ends or the dust seals<br />

of the cylinders.<br />

3. Be sure to install at least one shim on both sides of front<br />

joint pins.<br />

4. When the swing post is disassembled, coat the pins and<br />

the thrust plates with grease before reinstalling them.<br />

7-18<br />

M503-07-092<br />

M1LA-07-037

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!