WARNING - Flannery Plant Hire
WARNING - Flannery Plant Hire
WARNING - Flannery Plant Hire
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5<br />
d<br />
Swing Internal Gear<br />
--- every 500 hours<br />
MAINTENANCE<br />
<strong>WARNING</strong>: Before lubricating the swing bearing,<br />
lower the bucket and the blade to the ground, stop<br />
the engine, and place the pilot control shut-off lever<br />
to the LOCK position. Lubrication and rotation of the<br />
upperstructure must be done by one person only. Be<br />
sure to check that no personnel are present around<br />
the machine before starting to work.<br />
1. Remove the cover from the bottom center of the<br />
undercarriage.<br />
Check if grease inside is cloudy due to mixing of water or<br />
dirt.<br />
2. Apply grease via grease fittings by the quantity shown in<br />
the table.<br />
3. In order to apply grease evenly to the swing gear,<br />
raise the bucket approximately 200 mm (8 in) above<br />
the ground. While swinging the upperstructure at<br />
approximately 90° intervals until one full turn is made,<br />
add grease at each interval.<br />
ZX14-3,<br />
16-3, 18-3<br />
Greasing Quantity Total Grease Capacity<br />
0.2 L (0.21 US qt) 0.6 L (0.63 US qt)<br />
ZX27-3 0.2 L (0.21 US qt)<br />
6<br />
Control Lever Universal Joint<br />
--- every 500 hours or yearly<br />
3.0 to 3.3 L (3.2 to 3.5<br />
US qt)<br />
Pull up the rubber boots under the right and left control levers,<br />
remove two screws (1) to remove bracket (2). After moving the<br />
rubber boots upward, add grease to the four places of the pilot<br />
valve pushers as indicated by arrows.<br />
7-20<br />
Swing Gear Swing Bearing<br />
1<br />
Swing Bearing<br />
ZX14-3, 16-3, 18-3<br />
Swing Gear<br />
ZX27-3<br />
2<br />
M1NC-00-001<br />
M1M7-07-025<br />
M1M7-07-026<br />
M1M7-07-016