21.12.2012 Views

WARNING - Flannery Plant Hire

WARNING - Flannery Plant Hire

WARNING - Flannery Plant Hire

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Breaking in New Machine<br />

IMPORTANT: Operating a new machine at full load<br />

without first breaking in can cause<br />

scratches and/or seizures, consequently<br />

affecting the service life of the machine.<br />

Thoroughly perform break-in operation.<br />

BREAK-IN<br />

The service life and performance of the machine can be greatly<br />

affected by operation and maintenance of the machine during<br />

the initial stage of operation. Perform break-in operation with<br />

the engine output less than 80% of the maximum output for<br />

the first 50 hours.<br />

2-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!