Execution of the Concrete Agreement

The execution of the agreement was subdivided into two phases:

- Phase 1: building (10 July 2018 - 1 January 2022)

- Phase 2: scaling up (1 January 2022 – December 2029)

What follows is a description of experiences from the building

phase only, as scaling up has yet to begin.

During the building phase, which is currently on-going, we want to

ensure that everyone from the concrete sector and commissioning

parties can implement the Concrete Agreement. Together with

a secretariat (of 0.6 FTE), I orchestrate the overall process. As a

first step in this phase, I outlined a governance structure in close

collaboration with the steering committee. This steering committee

consists of 12 members, each representing a particular subsector

of the concrete product chain, public and private commissioning

parties, the national government, research institutions and

civil society. As chair of the steering group and the transition

broker, I prepare the meetings with the secretary. Besides that,

a monitoring committee consists of three independent experts.

They were asked to publish a yearly report on the progress being

made, based on the input of the participants themselves. Finally,

seven self-steering execution teams were instated to oversee the

following themes: CO 2

reduction; circular design; recycling of

residual concrete streams; natural capital; an environmental costs

indicator (MKI) assessing the overall environmental improvement;

knowledge and innovation; and education and knowledge-sharing.

The steering group appointed directors for each team, who are

tasked to prepare a roadmap for how to achieve the targets and

on the needed instruments and monitoring indicators. Most costs

for these activities are paid out-of-pocket by the participants

themselves. The government has made some money available

for hiring experts for specific tasks, financing the secretariat and

communicating the results. By 1 January 2022, all preparatory

work should be finished. From then on, everyone in the concrete

chain is expected to act according to rules formulated in the

Concrete Agreement. In the meantime, frontrunners have already

implemented the needed measures.