- Page 1 and 2:
FM 3-34.22 (FM 3-34.221, 5-7-30, 5-
- Page 3 and 4:
Field Manual No.3-34.22 Distributio
- Page 5 and 6:
Contents Planning .................
- Page 7 and 8:
Contents Table A-1. Metric conversi
- Page 9 and 10:
Preface � Chapter 3 describes eng
- Page 11 and 12:
Introduction This manual incorporat
- Page 13 and 14:
Chapter 1 Engineer Support to the B
- Page 15 and 16:
FULL SPECTRUM OPERATIONS Engineer S
- Page 17 and 18:
Engineer Support to the Brigade Com
- Page 19 and 20:
OPERATIONS Engineer Support to the
- Page 21 and 22:
Engineer Support to the Brigade Com
- Page 23 and 24:
Engineer Support to the Brigade Com
- Page 25 and 26:
� Information protection. � Fra
- Page 27 and 28:
Engineer Support to the Brigade Com
- Page 29 and 30:
Chapter 2 Integration of Engineer O
- Page 31 and 32:
Integration of Engineer Operations
- Page 33 and 34:
Figure 2-1. Typical BCT CP layout C
- Page 35 and 36:
Integration of Engineer Operations
- Page 37 and 38:
Integration of Engineer Operations
- Page 39 and 40:
COA approval Orders production Rehe
- Page 41 and 42:
Integration of Engineer Operations
- Page 43 and 44:
Integration of Engineer Operations
- Page 45 and 46:
EXECUTION Integration of Engineer O
- Page 47 and 48:
PROJECT MANAGEMENT Integration of E
- Page 49 and 50:
Chapter 3 Engineer Support to Intel
- Page 51 and 52:
Engineer Support to Intelligence, S
- Page 53 and 54:
Engineer Support to Intelligence, S
- Page 55 and 56:
Engineer Support to Intelligence, S
- Page 57 and 58:
Chapter 4 Engineer Support to Secur
- Page 59 and 60:
Engineer Support to Security Operat
- Page 61 and 62:
Engineer Support to Security Operat
- Page 63 and 64:
Engineer Support to Security Operat
- Page 65 and 66:
ORGANIZATION 4-29. The convoy secur
- Page 67 and 68:
Chapter 5 Engineer Support to Letha
- Page 69 and 70:
Engineer Support to Lethal and Nonl
- Page 71 and 72:
MEETINGS Engineer Support to Lethal
- Page 73 and 74:
Engineer Support to Lethal and Nonl
- Page 75 and 76:
Chapter 6 Engineer Support to Comba
- Page 77 and 78:
Engineer Support to Combat Operatio
- Page 79 and 80:
Figure 6-1. Engineer support to an
- Page 81 and 82:
ENVELOPMENT Engineer Support to Com
- Page 83 and 84:
Engineer Support to Combat Operatio
- Page 85 and 86:
Main Effort Engineer Support to Com
- Page 87 and 88:
Engineer Support to Combat Operatio
- Page 89 and 90:
Mobility � Possible enemy counter
- Page 91 and 92:
Engineer Support to Combat Operatio
- Page 93 and 94:
Flexibility Figure 6-7. Obstacle ef
- Page 95 and 96:
6-97. The survivability effort in a
- Page 97 and 98:
Engineer Support to Combat Operatio
- Page 99 and 100:
Engineer Support to Combat Operatio
- Page 101 and 102:
Engineer Support to Combat Operatio
- Page 103 and 104:
Chapter 7 Stability and Civil Suppo
- Page 105 and 106:
ENGINEERS Stability and Civil Suppo
- Page 107 and 108:
Stability and Civil Support Operati
- Page 109 and 110:
Stability and Civil Support Operati
- Page 111 and 112:
Noncombatant Evacuations Stability
- Page 113 and 114:
Figure 7-1. Civil support framework
- Page 115 and 116:
Stability and Civil Support Operati
- Page 117 and 118:
Fires Stability and Civil Support O
- Page 119 and 120:
Stability and Civil Support Operati
- Page 121 and 122:
Chapter 8 Sustainment Support for E
- Page 123 and 124:
Sustainment Support for Engineer Op
- Page 125 and 126:
Integration Sustainment Support for
- Page 127 and 128:
Sustainment Support for Engineer Op
- Page 129 and 130:
Sustainment Support for Engineer Op
- Page 131 and 132:
Sustainment Support for Engineer Op
- Page 133 and 134:
Sustainment Support for Engineer Op
- Page 135 and 136:
Sustainment Support for Engineer Op
- Page 137 and 138:
Other Personnel Services Sustainmen
- Page 139 and 140:
Appendix A Metric Conversion Chart
- Page 141 and 142:
Appendix B Selected Engineer Organi
- Page 143 and 144:
MULTIROLE BRIDGE COMPANY Selected E
- Page 145 and 146:
Figure B-1. BCTs and ACR structure
- Page 147 and 148:
Figure B-3. Engineer company, HBCT
- Page 149 and 150:
Figure B-5. Engineer company, SBCT
- Page 151 and 152:
Figure B-7. Engineer battalion Sele
- Page 153 and 154:
Figure B-9. MAC Selected Engineer O
- Page 155 and 156:
Figure B-11. Engineer support compa
- Page 157 and 158:
Figure B-13. Horizontal company Sel
- Page 159 and 160:
Figure B-15. EHCC Selected Engineer
- Page 161 and 162:
Figure B-17. Mine dog detachment he
- Page 163 and 164:
Appendix C Combined Arms Breaching
- Page 165 and 166:
� Intelligence. � Breaching fun
- Page 167 and 168:
Combined Arms Breaching Operations
- Page 169 and 170:
Combined Arms Breaching Operations
- Page 171 and 172:
PREPARATION Combined Arms Breaching
- Page 173 and 174:
Appendix D Clearing Operations Base
- Page 175 and 176: Table D-1 Selected units involved i
- Page 177 and 178: D-11. Route clearance teams are gen
- Page 179 and 180: Contiguous Clearing Operations D-16
- Page 181 and 182: Table D-4. Selected planning consid
- Page 183 and 184: Clearing Operations varies with the
- Page 185 and 186: METHODS Figure D-4. Sample clearanc
- Page 187 and 188: Clearing Operations D-36. The resul
- Page 189 and 190: TYPES Appendix E Combined Arms Gap-
- Page 191 and 192: Combined Arms Gap-Crossing Operatio
- Page 193 and 194: Hasty (Dry) Combined Arms Gap-Cross
- Page 195 and 196: CONTROL ELEMENTS Figure E-4. Overvi
- Page 197 and 198: Phase/CP BCT main CP (brigade cross
- Page 199 and 200: Combined Arms Gap-Crossing Operatio
- Page 201 and 202: Appendix F Engineer Running Estimat
- Page 203 and 204: � Streams. � Hills or mountains
- Page 205 and 206: Analyze Friendly Mission and Capabi
- Page 207 and 208: PREPARATION AND EXECUTION Engineer
- Page 209 and 210: Appendix G Orders and Annexes Plans
- Page 211 and 212: Orders and Annexes � General engi
- Page 213 and 214: ENGINEER UNIT ORDERS Orders and Ann
- Page 215 and 216: Orders and Annexes [Classification]
- Page 217 and 218: Orders and Annexes 4. SERVICE SUPPO
- Page 219 and 220: Appendix H Urban Operations Army fo
- Page 221 and 222: Shape Urban Operations H-6. Enginee
- Page 223 and 224: PLANNING FOR URBAN OPERATIONS Urban
- Page 225: Table H-3. Civil considerations usi
- Page 229 and 230: Glossary The glossary lists acronym
- Page 231 and 232: const construction CONUS continenta
- Page 233 and 234: FSMT forward support medical evacua
- Page 235 and 236: MOPMS Modular-Pack Mine System MOS
- Page 237 and 238: S-8 financial management staff offi
- Page 239 and 240: Glossary assured mobility A framewo
- Page 241 and 242: Glossary All information of importa
- Page 243 and 244: References SOURCES USED These are t
- Page 245 and 246: DD Form 1380, US Field Medical Card
- Page 247 and 248: A area clearance, 6-2, D-11 final m
- Page 249 and 250: By order of the Secretary of the Ar