26.09.2012 Views

Operating Instructions, complete - W. Gantenbein GmbH

Operating Instructions, complete - W. Gantenbein GmbH

Operating Instructions, complete - W. Gantenbein GmbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Operating</strong> <strong>Instructions</strong><br />

BUFALO Rondofix V3.0<br />

6.2. Erecting and testing the machine<br />

Check the following points before commissioning:<br />

• Is the power cable intact and properly connected?<br />

Indication<br />

Check the rotation of the motors. The gluing rollers may be used for this. If<br />

they will not turn, the motor rotation needs reversing.<br />

• Has the power cable been laid covered and secured?<br />

• Are there no foreign materials on or at the machine'?<br />

• Check whether the paper grippers run properly and unobstructed.<br />

• Check whether the infeed station functions faultlessly and unobstructed.<br />

• Check whether the cutting station functions faultlessly and unobstructed.<br />

• Check whether the fixing station functions faultlessly and unobstructed.<br />

• Check whether the gluing station and gluing rollers function faultlessly and unobstructed.<br />

• Check whether the pressing station functions faultlessly and unobstructed.<br />

• Check whether the delivery station functions faultlessly and unobstructed.<br />

• If one of the stations malfunctions, see Section 7.6 Trouble Shooting and rectify the fault as<br />

instructed therein.<br />

6.2.1. Putting the machine into operation<br />

To commission the machine proceed as follows:<br />

• Schalten Sie den Hauptschalter ein.<br />

• Check the emergency stop switches and release them if necessary (see<br />

subsection 3.4).<br />

• Switch the machine on (see Section 5).<br />

• Switch the machine over to manual operation (see Section 7).<br />

• Test the door interlock circuit of the cutter/fixer and gluing station/press by opening<br />

the doors singly and closing them again. When any of these doors is opened the<br />

control must cut out and a fault must be signalled.<br />

6.2.2. Testing the function<br />

Check all functions according to Section 5 before considering the commissioning<br />

<strong>complete</strong>d and handing the machine over for normal operation.<br />

6.2.3. Acceptance certificate<br />

The acceptance certificate must be copied. Do not write on the original. See appendix.<br />

� 39 <strong>Operating</strong>s <strong>Instructions</strong> Edition 22. November 2007<br />

Bufalo Rondofix V3.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!