Replies to Questions from Finance Committee Members
Replies to Questions from Finance Committee Members
Replies to Questions from Finance Committee Members
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Name of consultants (if<br />
available)<br />
Asked by: Hon. HO Sau-lan, Cyd<br />
Description Consultancy fees Status of consultancy studies (planning/ in<br />
progress / completed)<br />
Reply: (1) The Environment, Transport and Works Bureau (Environment and Transport Branch) (ETWB<br />
(E&T)) and the Highways Department (HyD) commissioned consultancy studies for policy<br />
making and assessment in 2001-02 and 2002-03. Details are as follows:<br />
Name of<br />
consultants (if<br />
available)<br />
Wilbur Smith<br />
Association<br />
Limited<br />
Ove Arup &<br />
Partners<br />
Description Consultancy<br />
fees<br />
The study serves <strong>to</strong><br />
collect data and<br />
conduct researches<br />
on mainland and<br />
overseas experience<br />
in operating and<br />
managing tunnel and<br />
<strong>to</strong>lled roads with a<br />
view <strong>to</strong> exploring<br />
ways <strong>to</strong> optimise the<br />
utilisation of road<br />
harbour crossings.<br />
(ETWB (E&T))<br />
Consultancy study<br />
for reviewing<br />
schedule of rates for<br />
highway term<br />
maintenance<br />
contracts (HyD)<br />
Progress on<br />
consultancy<br />
studies<br />
(planning/ in<br />
progress /<br />
completed)<br />
The<br />
Administration’s<br />
follow-up action on<br />
the study reports and<br />
the progress made<br />
$3,400,000 In progress The preliminary<br />
findings of the study<br />
will be available in<br />
April 2003 and the<br />
Administration will<br />
present the findings<br />
<strong>to</strong> LegCo Panel on<br />
Transport in April<br />
2003.<br />
$450,000 Completed The consultant's<br />
recommendations on<br />
schedule of rates<br />
have been<br />
incorporated as base<br />
rates for the highway<br />
term maintenance<br />
contracts<br />
Reasons for no<br />
follow-up action<br />
on the study<br />
reports and<br />
whether other<br />
measures are<br />
available <strong>to</strong> deal<br />
with the subjects<br />
under study<br />
N.A.<br />
For other departments, there have been no provisions for conducting such consultancy studies in 2001-02<br />
and 2002-03.<br />
(2) Details of the consultancy study for policy making and assessment commissioned by HyD in 2001-02<br />
and 2002-03 for which financial provision has not been allocated are as follows:<br />
N/A