Replies to Questions from Finance Committee Members
Replies to Questions from Finance Committee Members
Replies to Questions from Finance Committee Members
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Head:<br />
42 EMSD<br />
Examination of Estimates of Expenditure 2003-04 Reply Serial No.<br />
CONTROLLING OFFICER’S REPLY TO<br />
WRITTEN/SUPPLEMENTARY QUESTION<br />
ETWB(E) 023<br />
Subhead(No. & title):<br />
700 General other non- recurrent<br />
Programme: 3 - Energy efficiency and air quality<br />
Controlling Officer: Direc<strong>to</strong>r of Electrical and Mechanical Services<br />
Direc<strong>to</strong>r of Bureau: Secretary for the Environment, Transport and Works<br />
Question :<br />
Question Serial No.<br />
The studies in items 702, 703 and 705 are all studies on water-cooled air-conditioning systems. What are the<br />
details and conclusions of item 702 “Terri<strong>to</strong>ry-wide implementation study for water-cooled air-conditioning<br />
systems in Hong Kong”? Is there any conclusion that it is suitable <strong>to</strong> develop water-cooled air-conditioning<br />
systems in South East Kowloon, Wanchai and Causeway Bay Districts? How are items 703 and 705 related<br />
<strong>to</strong> item 702?<br />
Asked by: Hon. CHOY So-yuk<br />
Reply:<br />
The Item 702 on “Terri<strong>to</strong>ry-wide implementation study for water-cooled air conditioning systems in Hong<br />
Kong” started in Oc<strong>to</strong>ber 2000 <strong>to</strong> formulate plans, programmes and control requirements for the phased<br />
implementation of water-cooled air conditioning (WAC) systems in the whole terri<strong>to</strong>ry. The study includes<br />
examination of the general environmental, health, regula<strong>to</strong>ry, institutional, financial, technical and land<br />
administration issues associated with WAC systems. The study is close <strong>to</strong> completion and its findings will be<br />
submitted <strong>to</strong> the Legislative Council Panel on Environmental Affairs shortly. The study has identified several<br />
potential areas such as the South East Kowloon and Wanchai and Causeway Bay districts for developing the<br />
WAC system.<br />
Items 703 and 705 are exemplary district implementation studies which examine the technological details and<br />
recommend appropriate implementation strategies and preliminary system design for implementing WAC<br />
systems in these districts. Item 703 is for a new development district, i.e. the South East Kowloon<br />
Development and the Executive Summary of the findings and recommendations has been uploaded on<strong>to</strong> the<br />
website of Electrical & Mechanical Services Department for public comment. Item 705 is for a study on an<br />
existing district, i.e. Wanchai and Causeway Bay and will be completed in the second half of 2003.<br />
Go<strong>to</strong><strong>to</strong>p<br />
Signature<br />
Name in block letter Roger S. H. LAI<br />
0012<br />
Post Title Direc<strong>to</strong>r of Electrical and Mechanical Services<br />
Date 19 March 2003