Examination of Estimates of Expenditure 2003-04 Reply Serial No.<br />

CONTROLLING OFFICER’S REPLY TO<br />

INITIAL WRITTEN QUESTION<br />

ETWB(W)044<br />

Question Serial No.<br />

0025<br />

Head: Capital Works Reserve Fund – Head 705 Subhead: 5001BX – Landslip<br />

preventive measure<br />

Programme:<br />

Controlling Officer: Direc<strong>to</strong>r of Civil Engineering<br />

Direc<strong>to</strong>r of Bureau: Secretary for the Environment, Transport and Works<br />

Question : How many slopes were greened and landscaped in the past three years by<br />

the Civil Engineering Department? What was the related expenditure?<br />

Generally speaking, what percentage of cost does landscape works constitute<br />

amongst the <strong>to</strong>tal cost of slope upgrading works?<br />

Asked by: Hon. CHOY So-yuk<br />

Reply: In the past three years, 772 slopes and retaining walls were landscaped under<br />

the Landslip Preventive Measures Programme managed by the Civil<br />

Engineering Department. Of these, 505 were greened. The others were<br />

treated with landscape measures <strong>to</strong> enhance their appearance. The <strong>to</strong>tal<br />

expenditure on landscaping and greening of slopes was $153 million. The<br />

breakdown of the above figures in the past three years is as follows -<br />

Year<br />

No. of slopes and retaining<br />

walls landscaped (greened)<br />

Expenditure<br />

$ million<br />

2000 256 (154) 33<br />

2001 250 (149) 60<br />

2002 266 (202) 60<br />

772 (505) 153<br />

The cost of landscape works constitutes about 10% of the <strong>to</strong>tal cost of slope<br />

upgrading works.<br />

Signature<br />

Go<strong>to</strong><strong>to</strong>p<br />

Name in block letters T K TSAO<br />

Post Title Direc<strong>to</strong>r of Civil Engineering<br />

Date 17 March 2003