Examination of Estimates of Expenditure 2003-04 Reply Serial No.<br />
CONTROLLING OFFICER’S REPLY TO<br />
INITIAL WRITTEN QUESTION<br />
ETWB(E)046<br />
Head : 44 Environmental Protection Department Subhead(No. &<br />
title):<br />
Programme : (1) Waste Facilities<br />
Controlling Officer : Direc<strong>to</strong>r of Environmental Protection<br />
Direc<strong>to</strong>r of Bureau : Secretary for the Environment, Transport and Works<br />
Question Serial No.<br />
Question : Would the Government inform this Council:<br />
Please list out the usage and the locations of the landfills that have been res<strong>to</strong>red and<br />
developed for beneficial uses. What is the annual expenditure and staffing for the<br />
moni<strong>to</strong>ring and management of respective landfills? Please provide the breakdown by<br />
post.<br />
Asked by : Hon. CHOY So-yuk<br />
Reply : The details for the old landfills where the main res<strong>to</strong>ration works have been completed are<br />
provided below. Please note that even when the main res<strong>to</strong>ration works have been<br />
completed, the landfills will continue <strong>to</strong> generate landfill gas and leachate for a very long<br />
time as degradation of waste proceeds for many years. It should be noted that res<strong>to</strong>ration is<br />
an on-going process and resources are required <strong>to</strong> operate and maintain the res<strong>to</strong>ration works<br />
<strong>to</strong> ensure that the sites would not pose any hazard <strong>to</strong> the adjacent environment.<br />
Go<strong>to</strong><strong>to</strong>p<br />
0052<br />
The main res<strong>to</strong>ration works for the Shuen Wan Landfill in Tai Po were completed in December<br />
1997. The estimated expenditure in 2003-04 for the operation and maintenance of these works<br />
is $4.8 million and 0.5 Environmental Protection Officer (EPO), 1 Senior Environmental<br />
Protection Inspec<strong>to</strong>r (SEPI) and 2 Environmental Protection Inspec<strong>to</strong>rs (EPI) are provided for<br />
the moni<strong>to</strong>ring and management of this landfill. While the res<strong>to</strong>ration process will be<br />
ongoing for many years, the site has been developed for a beneficial interim after use and has<br />
been used as a golf driving range since April 1999.<br />
The main res<strong>to</strong>ration works for the Sai Tso Wan Landfill in Kwun Tong were completed in<br />
May 1998. The construction of a multi-purpose grass pitch for football and baseball at the<br />
landfill has just commenced. The estimated expenditure in 2003-04 for the operation and<br />
maintenance of the res<strong>to</strong>ration works is $2.1 million. This will be increased <strong>to</strong> $6.1 million per<br />
annum when the grass pitch is open <strong>to</strong> the public in March 2004 but the staffing for the<br />
moni<strong>to</strong>ring and management of this landfill will remain as 0.2 EPO, 0.2 SEPI and 0.6 EPI.<br />
Signature<br />
Name in block letters ROBERT J. S. LAW<br />
Post Title Direc<strong>to</strong>r of Environmental Protection<br />
Date 20 March 2003