Examination of Estimates of Expenditure 2003-04 Reply Serial No.<br />

CONTROLLING OFFICER’S REPLY TO<br />

INITIAL WRITTEN QUESTION<br />

ETWB(E)046<br />

Head : 44 Environmental Protection Department Subhead(No. &<br />

title):<br />

Programme : (1) Waste Facilities<br />

Controlling Officer : Direc<strong>to</strong>r of Environmental Protection<br />

Direc<strong>to</strong>r of Bureau : Secretary for the Environment, Transport and Works<br />

Question Serial No.<br />

Question : Would the Government inform this Council:<br />

Please list out the usage and the locations of the landfills that have been res<strong>to</strong>red and<br />

developed for beneficial uses. What is the annual expenditure and staffing for the<br />

moni<strong>to</strong>ring and management of respective landfills? Please provide the breakdown by<br />

post.<br />

Asked by : Hon. CHOY So-yuk<br />

Reply : The details for the old landfills where the main res<strong>to</strong>ration works have been completed are<br />

provided below. Please note that even when the main res<strong>to</strong>ration works have been<br />

completed, the landfills will continue <strong>to</strong> generate landfill gas and leachate for a very long<br />

time as degradation of waste proceeds for many years. It should be noted that res<strong>to</strong>ration is<br />

an on-going process and resources are required <strong>to</strong> operate and maintain the res<strong>to</strong>ration works<br />

<strong>to</strong> ensure that the sites would not pose any hazard <strong>to</strong> the adjacent environment.<br />

Go<strong>to</strong><strong>to</strong>p<br />

0052<br />

The main res<strong>to</strong>ration works for the Shuen Wan Landfill in Tai Po were completed in December<br />

1997. The estimated expenditure in 2003-04 for the operation and maintenance of these works<br />

is $4.8 million and 0.5 Environmental Protection Officer (EPO), 1 Senior Environmental<br />

Protection Inspec<strong>to</strong>r (SEPI) and 2 Environmental Protection Inspec<strong>to</strong>rs (EPI) are provided for<br />

the moni<strong>to</strong>ring and management of this landfill. While the res<strong>to</strong>ration process will be<br />

ongoing for many years, the site has been developed for a beneficial interim after use and has<br />

been used as a golf driving range since April 1999.<br />

The main res<strong>to</strong>ration works for the Sai Tso Wan Landfill in Kwun Tong were completed in<br />

May 1998. The construction of a multi-purpose grass pitch for football and baseball at the<br />

landfill has just commenced. The estimated expenditure in 2003-04 for the operation and<br />

maintenance of the res<strong>to</strong>ration works is $2.1 million. This will be increased <strong>to</strong> $6.1 million per<br />

annum when the grass pitch is open <strong>to</strong> the public in March 2004 but the staffing for the<br />

moni<strong>to</strong>ring and management of this landfill will remain as 0.2 EPO, 0.2 SEPI and 0.6 EPI.<br />

Signature<br />

Name in block letters ROBERT J. S. LAW<br />

Post Title Direc<strong>to</strong>r of Environmental Protection<br />

Date 20 March 2003