Go<strong>to</strong><strong>to</strong>p<br />

The ILE comprises the North Hong Kong Island Line (NIL) and the<br />

West Hong Kong Island Line (WIL). The function of the NIL is <strong>to</strong><br />

relieve congestion at Mass Transit Railway Tsuen Wan Line and Island<br />

Line. Due <strong>to</strong> the reduction in forecast employment in the Western<br />

District and along the north shore of Hong Kong Island, we have<br />

decided <strong>to</strong> defer the implementation of NIL beyond 2016. We have<br />

asked MTR Corporation Limited (MTRCL) <strong>to</strong> proceed with further<br />

planning of the WIL Phase 1 <strong>from</strong> Sheung Wan <strong>to</strong> Belcher. Planning of<br />

the WIL Phase 2 <strong>from</strong> Belcher <strong>to</strong> Kennedy Town will be reviewed in<br />

the context of the review of the proposed reclamation at Western<br />

District Development.<br />

The implementation of the NOL depends both on the development<br />

programme of the Strategic Growth Areas (SGA) along this rail line,<br />

which is under review and the growth in cross-boundary rail traffic.<br />

We will continue <strong>to</strong> moni<strong>to</strong>r its implementation in the light of these two<br />

fac<strong>to</strong>rs.<br />

The implementation of PRL depends on the growth of the<br />

cross-boundary rail-borne freight traffic <strong>to</strong> the Kwai Chung Container<br />

Ports. KCRC will soon complete its study on the viability of the PRL.<br />

The REL is designed as a direct and separate rail link running <strong>from</strong><br />

Hung Hom <strong>to</strong> the boundary. It will form part of the<br />

Guangzhou-Shenzhen-Hong Kong Express Rail Link and we are now<br />

conducting a feasibility study jointly with the Mainland’s Ministry of<br />

Railways on this link.<br />

(b) As illustrated above, the implementation programme of the rail projects<br />

recommended in RDS-2000 will be regularly reviewed <strong>to</strong> take in<strong>to</strong><br />

account the latest planning parameters and transport demand.<br />

(c) The work is undertaken by existing staff with no additional resources<br />

provided.<br />

Signature<br />

Name in block letters MRS RITA LAU<br />

Post Title Permanent Secretary for the<br />

Environment, Transport and<br />

Works (Environment)<br />

– 2 –<br />

Date 19 March 2003