Examination of Estimates of Expenditure 2003-04 Reply Serial No.<br />

CONTROLLING OFFICER’S REPLY TO<br />

INITIAL WRITTEN QUESTION<br />

ETWB(E)042<br />

Head : 44 Environmental Protection Department Subhead(No. &<br />

title):<br />

Programme : (2) Air<br />

Controlling Officer : Direc<strong>to</strong>r of Environmental Protection<br />

Direc<strong>to</strong>r of Bureau : Secretary for the Environment, Transport and Works<br />

Question Serial No.<br />

Question :Would the Government inform this Council:<br />

The work <strong>to</strong> be carried out in the coming financial year in following up the results of both<br />

the study on air pollution problems in the Pearl River Delta Region and the consensus<br />

reached with the Guangdong Provincial Government <strong>to</strong> improve air quality in the Region.<br />

What are the expenditure involved? Has the expenditure been included in the estimates<br />

under Programme 2?<br />

Asked by : Hon. CHOY So-yuk<br />

Reply : In 2003-04, the following work will be carried out as a result of both the Pearl River Delta<br />

Regional Air Quality Study and the consensus reached with the Guangdong Provincial<br />

Government:<br />

Go<strong>to</strong><strong>to</strong>p<br />

0018<br />

(a) drawing up a plan for improving regional air quality;<br />

(b) evaluating the feasibility of a pilot emission trading scheme for some power stations in<br />

the region;<br />

(c) establishing and operating a network of regional air quality moni<strong>to</strong>ring stations;<br />

(d) developing a handbook for compiling regional emission inven<strong>to</strong>ry;<br />

(e) compiling the regional emission inven<strong>to</strong>ry for year 2001; and<br />

(f) conducting technical exchange programmes.<br />

Our part of the work will cost about $6.40 million, which has already been included in the<br />

estimates for 2003-04 under Programme 2.<br />

Signature<br />

Name in block letters ROBERT J. S. LAW<br />

Post Title Direc<strong>to</strong>r of Environmental Protection<br />

Date 20 March 2003