Examination of Estimates of Expenditure 2003-04 Reply Serial No.<br />
CONTROLLING OFFICER’S REPLY TO<br />
INITIAL WRITTEN QUESTION<br />
ETWB(E)042<br />
Head : 44 Environmental Protection Department Subhead(No. &<br />
title):<br />
Programme : (2) Air<br />
Controlling Officer : Direc<strong>to</strong>r of Environmental Protection<br />
Direc<strong>to</strong>r of Bureau : Secretary for the Environment, Transport and Works<br />
Question Serial No.<br />
Question :Would the Government inform this Council:<br />
The work <strong>to</strong> be carried out in the coming financial year in following up the results of both<br />
the study on air pollution problems in the Pearl River Delta Region and the consensus<br />
reached with the Guangdong Provincial Government <strong>to</strong> improve air quality in the Region.<br />
What are the expenditure involved? Has the expenditure been included in the estimates<br />
under Programme 2?<br />
Asked by : Hon. CHOY So-yuk<br />
Reply : In 2003-04, the following work will be carried out as a result of both the Pearl River Delta<br />
Regional Air Quality Study and the consensus reached with the Guangdong Provincial<br />
Government:<br />
Go<strong>to</strong><strong>to</strong>p<br />
0018<br />
(a) drawing up a plan for improving regional air quality;<br />
(b) evaluating the feasibility of a pilot emission trading scheme for some power stations in<br />
the region;<br />
(c) establishing and operating a network of regional air quality moni<strong>to</strong>ring stations;<br />
(d) developing a handbook for compiling regional emission inven<strong>to</strong>ry;<br />
(e) compiling the regional emission inven<strong>to</strong>ry for year 2001; and<br />
(f) conducting technical exchange programmes.<br />
Our part of the work will cost about $6.40 million, which has already been included in the<br />
estimates for 2003-04 under Programme 2.<br />
Signature<br />
Name in block letters ROBERT J. S. LAW<br />
Post Title Direc<strong>to</strong>r of Environmental Protection<br />