Examination of Estimates of Expenditure 2003-04<br />

CONTROLLING OFFICER'S REPLY TO<br />

INITIAL WRITTEN QUESTION<br />

Head: 43 - Civil Engineering Department Subhead (No. & title):<br />

Programme: (7) Management of Construction and Demolition Materials<br />

Controlling Officer: Direc<strong>to</strong>r of Civil Engineering<br />

Direc<strong>to</strong>r of Bureau: Secretary for the Environment, Transport and Works<br />

Reply Serial No.<br />

ETWB(E)027<br />

Question Serial No.<br />

0057<br />

Question: (a) In 2003-04, what is the estimated cost of operating the inert hard construction and<br />

demolition materials recycling facility in Tuen Mun Area 38? What is the<br />

estimated average cost of processing one <strong>to</strong>nne of inert hard construction and<br />

demolition materials? How will the recycled materials be handled?<br />

(b) In view of the operation of Tseung Kwan O Fill Bank an additional provision of<br />

$58.3 m is required. What are the estimated cost and its breakdown for operating<br />

the fill bank? What is the estimated quantity of s<strong>to</strong>ckpile in 2003-04? What is<br />

the estimated average cost for s<strong>to</strong>ckpiling each <strong>to</strong>nne of materials?<br />

Asked by : Hon. CHOY So-yuk<br />

Reply: (a) In 2003-04, the estimated cost of operating the recycling facility for inert hard<br />

construction and demolition (C&D) materials in Tuen Mun Area 38 is $12 m<br />

funded under Capital Works project vote. The average cost of processing the<br />

materials is estimated <strong>to</strong> be $50-$60 per <strong>to</strong>nne. The recycled aggregates are<br />

supplied <strong>to</strong> government projects for use as materials for road sub-base, drainage<br />

layer, filter layer, concrete works and paving block production.<br />

Go<strong>to</strong><strong>to</strong>p<br />

(b) The cost of operating the Tseung Kwan O Fill Bank in 2003-04 is estimated <strong>to</strong> be<br />

$80.3 m and the breakdown is as follows:<br />

Operating Cost of Fill Bank $72.0 m<br />

Staff Cost of CED $8.3 m<br />

The Fill Bank is expected <strong>to</strong> s<strong>to</strong>ckpile 4.7 m <strong>to</strong>nnes of C&D materials in 2003-04 and<br />

the average cost of s<strong>to</strong>ckpiling is estimated <strong>to</strong> be $17 per <strong>to</strong>nne.<br />

Signature<br />

Name in block letters T K TSAO<br />

Post Title Direc<strong>to</strong>r of Civil Engineering<br />

Date 19 March 2003