Replies to Questions from Finance Committee Members
Replies to Questions from Finance Committee Members
Replies to Questions from Finance Committee Members
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Examination of Estimates of Expenditure 2003-04 Reply Serial No.<br />
CONTROLLING OFFICER’S REPLY TO ETWB(W)021<br />
INITIAL WRITTEN QUESTION Question Serial No.<br />
0476<br />
Head: 43 – Civil Engineering Department Subhead: 700 General other non-recurrent<br />
Programme: (4) Slope Safety and Geotechnical Standards<br />
(5) Geotechnical Services<br />
(6) Supervision of Mining, Quarrying and Explosives<br />
Controlling Officer: Direc<strong>to</strong>r of Civil Engineering<br />
Direc<strong>to</strong>r of Bureau: Secretary for the Environment, Transport and Works<br />
Question : Under the general other non-recurrent expenditure, there is an increase of about<br />
$4.9M. Please give details of the items, and the reasons.<br />
Asked by: Hon. CHAN Kam-lam<br />
Reply: Details of the items are -<br />
Item<br />
Revised<br />
Estimate Estimate Increase/<br />
2002-03 2003-04 (Decrease)<br />
$M $M $M<br />
Quantitative risk assessment of landslide<br />
hazard<br />
0.910 1.000 0.090<br />
Study on the use of prescriptive measures in<br />
slope improvement works<br />
0.950 1.020 0.070<br />
Provision of warning signs in squatter areas 0.200 0.800 0.600<br />
Moni<strong>to</strong>ring of uncontaminated mud disposal<br />
area at South Cheung Chau and East<br />
Ninepins<br />
1.450 0.820 (0.630)<br />
Moni<strong>to</strong>ring of uncontaminated mud disposal<br />
area at north of Lantau and south of Tsing Yi<br />
2.650 3.213 0.563<br />
Publication of a Geoguide on Engineering<br />
Geology<br />
- 1.000 1.000<br />
Upgrading of Lotus Notes System for Civil<br />
Engineering Department<br />
0.500 1.250 0.750<br />
Data collection on slopes within squatter<br />
villages<br />
0.500 2.100 1.600<br />
Setting up of wave moni<strong>to</strong>ring stations - 0.905 0.905<br />
Total 7.160 12.108 4.948<br />
The increase is due <strong>to</strong> the cashflow requirements in different phases of projects,<br />
which span over several financial years and inclusion of new projects in 2003-04.<br />
Signature