Examination of Estimates of Expenditure 2003-04<br />
CONTROLLING OFFICER'S REPLY TO<br />
INITIAL WRITTEN QUESTION<br />
Head: 43 - Civil Engineering Department Subhead (No. & title):<br />
Programme: (7) Management of Construction and Demolition Materials<br />
Controlling Officer: Direc<strong>to</strong>r of Civil Engineering<br />
Direc<strong>to</strong>r of Bureau: Secretary for the Environment, Transport and Works<br />
Question: According <strong>to</strong> the documents, the provision for the programme “Management<br />
of Construction and Demolition Materials” is $58.3 m (88.9%) higher than last<br />
year, and it is mainly due <strong>to</strong> the expenditure for the Fill Bank at Tseung Kwan<br />
O Area 137. Regarding this, I would like the Government <strong>to</strong> provide us with<br />
details of the project covered by the increase of $58.3 m; and the detailed<br />
operation of the Fill Bank at Tseung Kwan O Area 137 such as its funding and<br />
the mode of operation.<br />
Asked by : Hon. IP Kwok-him<br />
Reply: The increase of $58.3 m in the provision for 2003 – 04 over the 2002-03<br />
revised estimate is mainly due <strong>to</strong> the operation of the Tseung Kwan O Fill<br />
Bank covering a full year period in 2003 – 04 at $80.3 m, as compared with<br />
$31.1 m for about a period of 5 months only in 2002-03.<br />
Go<strong>to</strong><strong>to</strong>p<br />
The Tseung Kwan O Fill Bank is operated by a contrac<strong>to</strong>r under the<br />
supervision of CED. The works involve the intake, s<strong>to</strong>ckpiling and removal<br />
of inert construction & demolition materials. The breakdown of the funding<br />
for the Fill Bank is as follows:<br />
Operating Cost for Fill Bank Contrac<strong>to</strong>r : $72.0 m<br />
Staff Cost of CED : $8.3 m<br />
Signature<br />
Name in block letters T K TSAO<br />
Reply Serial No.<br />
ETWB(E)030<br />
Question Serial No.<br />
1443<br />
Post Title Direc<strong>to</strong>r of Civil Engineering<br />
Date 20 March 2003