Examination of Estimates of Expenditure 2003-04<br />

CONTROLLING OFFICER'S REPLY TO<br />

INITIAL WRITTEN QUESTION<br />

Head: 43 - Civil Engineering Department Subhead (No. & title):<br />

Programme: (7) Management of Construction and Demolition Materials<br />

Controlling Officer: Direc<strong>to</strong>r of Civil Engineering<br />

Direc<strong>to</strong>r of Bureau: Secretary for the Environment, Transport and Works<br />

Question: According <strong>to</strong> the documents, the provision for the programme “Management<br />

of Construction and Demolition Materials” is $58.3 m (88.9%) higher than last<br />

year, and it is mainly due <strong>to</strong> the expenditure for the Fill Bank at Tseung Kwan<br />

O Area 137. Regarding this, I would like the Government <strong>to</strong> provide us with<br />

details of the project covered by the increase of $58.3 m; and the detailed<br />

operation of the Fill Bank at Tseung Kwan O Area 137 such as its funding and<br />

the mode of operation.<br />

Asked by : Hon. IP Kwok-him<br />

Reply: The increase of $58.3 m in the provision for 2003 – 04 over the 2002-03<br />

revised estimate is mainly due <strong>to</strong> the operation of the Tseung Kwan O Fill<br />

Bank covering a full year period in 2003 – 04 at $80.3 m, as compared with<br />

$31.1 m for about a period of 5 months only in 2002-03.<br />

Go<strong>to</strong><strong>to</strong>p<br />

The Tseung Kwan O Fill Bank is operated by a contrac<strong>to</strong>r under the<br />

supervision of CED. The works involve the intake, s<strong>to</strong>ckpiling and removal<br />

of inert construction & demolition materials. The breakdown of the funding<br />

for the Fill Bank is as follows:<br />

Operating Cost for Fill Bank Contrac<strong>to</strong>r : $72.0 m<br />

Staff Cost of CED : $8.3 m<br />

Signature<br />

Name in block letters T K TSAO<br />

Reply Serial No.<br />

ETWB(E)030<br />

Question Serial No.<br />

1443<br />

Post Title Direc<strong>to</strong>r of Civil Engineering<br />

Date 20 March 2003